Date |
Text |
2016-05-23 12:50:22 | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE |
| PREVIOUSLY REVIEWED REPLACED SHEETS DETACHED. |
| |
| CITY OF WEST PALM BEACH LOCAL AMENDMENTS TO THE FLORIDA |
| BUILDING CODE (FBC) 2010 CHAPTER 1 ADMINISTRATION |
| |
| 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. |
| |
| (1) AHU #1 - AS PER TRANE DUCULATOR 12"X12" [email protected] |
| FRICTION LOST PER 100' IS 850 CFM. PLAN IS SHOWING 2000 |
| CFM DUMPING INTO A 12"X12" DUCT. |
| AHU ON EQUIPMENT SCHEDULE IS SHOWING 1800 CFM. DESIGN |
| CFM ON PLANS IS 2000 CFM. |
| RETURN AIR GRILL ON PLANS IS A200. AS PER CEILINGOUTLET |
| SCHEDULE RETURMN AIR GRILL SHOULD BE D 2000. |
| CHECK YOUR CALCULATIONS AND MAKE THE CORRECTIONS. |
| ALL SMOKE DETECTORS WILL BE INSTALLED IN RETURN AIR. |
| (AS PER FBC MECHANICAL CODE 2014) |
| |
| (2) AHU #2 - PLANS SHOW RETURN AIR IS 1300CFM. TOTAL |
| SUPPLY AIR IS 2800. |
| AS PER TRANE DUCULATOR 12"X12" [email protected] FRICTION LOST |
| PER 100' IS 850 CFM. PLAN IS SHOWING 2800 CFM DUMPING |
| INTO A 12"X12" DUCT. |
| CHECK YOUR CALCULATIONS AND MAKE THE CORRECTIONS. |
| ALL SMOKE DETECTORS WILL BE INSTALLED IN RETURN AIR. |
| (AS PER FBC MECHANICAL CODE 2014) |
| |
| (3) AHU #3 - PROVIDE RETURN AIR. |
| ALL SMOKE DETECTORS WILL BE INSTALLED IN RETURN AIR. |
| (AS PER FBC MECHANICAL CODE 2014) |
| |
| (4) AHU #4 - AHU ON EQUIPMENT SCHEDULE IS SHOWING 1800 |
| CFM. DESIGN CFM ON PLANS IS 2000 CFM. |
| DRAWING OF SUPPLY DUCT ON PLANS SHOW PHYSICAL REDUCTION |
| IN DUCT SIZES BUT DUCT IS IDENTIFIED AS 18" DUCT |
| THROUGHOUT. |
| CHECK YOUR CALCULATIONS AND MAKE THE CORRECTIONS. |
| ALL SMOKE DETECTORS WILL BE INSTALLED IN RETURN AIR. |
| (AS PER FBC MECHANICAL CODE 2014) |
| |
| (5) AHU #5 - AHU ON EQUIPMENT SCHEDULE IS SHOWING 1800 |
| CFM. DESIGN CFM ON PLANS IS 2000 CFM. |
| PROVIDE ON PLANS RETURN AIR. |
| SHOW ALL OUTSIDE AIR DUCTS FOR AHU. |
| ALL SMOKE DETECTORS WILL BE INSTALLED IN RETURN AIR. |
| (AS PER FBC MECHANICAL CODE 2014) |
| |
| CHANGE #2 ON EQUIPMENT SCHEDULE TO ALL SMOKE DETECTORS |
| WILL BE INSTALLED IN RETURN AIR. (AS PER FBC MECHANICAL |
| CODE 2014) |
| |
| |