Plan Review Notes For Permit 16050721 |
Permit Number |
16050721 |
|
Review Stop |
B |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2016-05-24 14:53:27 | PLAN | | REVIEW COMMENTS | | | | 1ST REVIEW: FBC FIFTH EDITION (2014) | | ROBERT MCDOUGAL, CBO | | COMMERCIAL COMBINATION PLANS EXAMINER | | (561) 805-6714 | | [email protected] | | | | DENIED BY BUILDING | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | 1) THE INSTALLATION SCHEDULE IS NOT CLEAR WHICH ONES | | ARE THE STORM PANELS AND WHICH ARE THE ACCORDIONS. THE | | SUBSTRATE IS LISTED AS CONCRETE BLOCK ON THE | | INSTALLATION SCHEDULE FOR ALL OPENINGS AND THE SPACING | | MARKED ON THE PRODUCT APPROVAL FOR SOME OF THE STORM | | PANELS AND ACCORDIONS IS FOR POURED CONCRETE. FBC | | 107.2.3 | | | | 2) FOR THE SHUTTER MOUNTING TYPE ON THE INSTALLATION | | SCHEDULE YOU NEED TO LIST THE SPECIFIC NUMBER FROM THE | | PRODUCT APPROVAL FOR THE TOP AND BOTTOM MOUNTING TYPE | | FOR EACH OPENING. FBC 107.2.3 | | | | 3) INDICATE WHICH OPENINGS HAVE PANELS AND WHICH HAVE | | ACCORDIONS. FBC 107.2.3 | | | | 4) TWO COPIES OF THE CONSTRUCTION DOCUMENTS ARE | | REQUIRED TO BE SUBMITTED AND ONLY ONE WAS SUBMITTED. I | | MADE COPIES FOR YOU THIS TIME, HOWEVER, FUTURE | | SUBMITTALS WILL BE DENIED. FBC 107.1 |
|