2016-06-02 09:51:22PROVISOS:
  
 1. CONTRACTORS, SUBCONTRACTORS AND PERSONS HOLDING
 PERMITS TO PERFORM LAND DISTURBING CONSTRUCTION OR
 LAND DEVELOPMENT ACTIVITIES, AND THE LANDOWNERS OF
 CONSTRUCTION SITES SHALL CAUSE THE CONSTRUCTION
 SITE TO BE MAINTAINED IN A NEAT AND ORDERLY CONDITION
 THAT IS FREE FROM ANY DEBRIS, GARBAGE, JUNK,
 USED OR DISCARDED CONSTRUCTION MATERIALS, TRASH OR ANY
 OTHER FOREIGN SUBSTANCE PRODUCED AS A RESULT
 OF THE LAND DISTURBING CONSTRUCTION OR LAND DEVELOPMENT
 ACTIVITIES, OTHER THAN DEBRIS, GARBAGE, JUNK,
 TRASH OR OTHER FOREIGN SUBSTANCE DEPOSITED INTO AND
 CONTAINED WITHIN A TRASH RECEPTACLE OR TRASH
 DUMPSTER.
 2. IN ALL INSTANCES WHERE A BUILDING PERMIT HAS NOT
 BEEN ISSUED WITHIN THREE MONTHS OF THE COMPLETION
 OR ABANDONMENT OF LAND DISTURBING CONSTRUCTION
 ACTIVITIES, THE JOB SITE SHALL, WITHIN 30 DAYS AFTER
 THE
 EXPIRATION OF SUCH THREE?MONTH PERIOD, BE BROUGHT TO
 GRADE, TILLED, PLANTED AND MAINTAINED WITH
 GROUND COVER TO INCLUDE SODDING OR SEEDING WHICH SHALL
 HAVE IRRIGATION. ANY TEMPORARY CONSTRUCTION
 FENCE SHALL ALSO BE REMOVED. THE CONSTRUCTION SERVICES
 DIRECTOR OR DESIGNEE, WITH INPUT FROM THE
 PLANNING DIRECTOR OR DESIGNEE, MAY GRANT, IN WRITING,
 AN EXTENSION TO THE TIME FRAME FOR THE ISSUANCE
 OF A BUILDING PERMIT, UNDER THIS PARAGRAPH, WHEN THE
 LANDOWNER HAS DEMONSTRATED A GOOD FAITH
 EFFORT IN PURSUING THE BUILDING PERMIT BUT THAT
 CIRCUMSTANCES BEYOND THE CONTROL OF THE CONTRACTOR
 AND/OR PERMITTEE HAVE OCCURRED.
 3. ALL CONSTRUCTION WASTE AND DEBRIS FROM NEW
 CONSTRUCTION OR MAJOR ALTERATION OR REPAIR SHALL BE
 KEPT
 IN AN ENCLOSED CONTAINER TO MINIMIZE DEBRIS FROM
 LITTERING ADJACENT PROPERTIES AND PUBLIC RIGHTS?OFWAY.
 THE PERMITTEE, CONTRACTOR OR LANDOWNER SHALL CAUSE SUCH
 WASTE OR DEBRIS TO BE REMOVED WEEKLY
 IN ACCORDANCE WITH SECTION 74?2 OF THE CITY OF WEST
 PALM BEACH CODE OF ORDINANCES.
 4. ALL MUD OR DEBRIS SHALL BE CONTINUALLY REMOVED FROM
 THE PUBLIC SIDEWALKS AND STREETS.
 5. CONTRACTORS, SUBCONTRACTORS, PERSONS HOLDING PERMITS
 TO PERFORM LAND DISTURBING CONSTRUCTION AND
 LAND DEVELOPMENT ACTIVITIES AND THE LANDOWNERS OF
 CONSTRUCTION SITES SHALL, AT THE DIRECTION OF THE
 ENGINEERING SERVICES DIRECTOR OR DESIGNEE, EITHER
 REPAIR, OR REIMBURSE THE CITY FOR ITS COSTS INCURRED TO
 REPAIR, ANY DAMAGE TO ANY PUBLIC RIGHT?OF?WAY THAT IS
 CAUSED BY ANY CONSTRUCTION VEHICLE INVOLVED IN
 THE LAND DISTURBING CONSTRUCTION OR LAND DEVELOPMENT
 ACTIVITIES.
 6. IN THE EVENT THAT THE DEMOLITION PERMIT OR BUILDING
 PERMIT EXPIRES, ALL MATERIALS AND EQUIPMENT
 RELATED TO THE LAND DISTURBING CONSTRUCTION OR LAND
 DEVELOPMENT ACTIVITIES SHALL BE REMOVED FROM THE
 JOB SITE WITHIN TEN DAYS OF THE PERMIT EXPIRATION DATE.
 THE JOB SITE SHALL, WITHIN 30 DAYS THEREAFTER,
 BE BROUGHT TO GRADE, BE TILLED AND PLANTED WITH GROUND
 COVER TO INCLUDE SODDING OR SEEDING WHICH
 SHALL HAVE IRRIGATION. SAID GROUND COVER SHALL BE
 MAINTAINED IN ACCORDANCE WITH SUBSECTIONS 74?2(C)
 AND SECTION 94?446 OF THIS CODE.
 7. DEMOLITION CONTRACTOR WILL BE RESPONSIBLE FOR
 DEVELOPING AND IMPLEMENTING A SITE SPECIFIC STORMWATER
 POLLUTION PREVENTION PLAN (SWPPP).
 MINIMUM REQUIREMENTS FOR DEMOLITION PROJECTS
 THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR
 INSTALLATION OF APPROPRIATE EROSION AND SEDIMENT
 CONTROL
 MEASURES.
 EXISTING UTILITIES (WATER, SANITARY, STORMWATER, GAS,
 ELECTRIC, ETC.) WILL BE CAPPED OR REMOVED PRIOR TO
 THE START OF ANY OTHER DEMOLITION ACTIVITIES.
 PRIOR TO THE START OF ANY DEMOLITION ACTIVITIES, A
 DOUBLE ROW OF SILT FENCING WILL BE INSTALLED AT THE
 BETWEEN THE SITE AND ANY ADJACENT BODIES OF WATER.
 WHERE POSSIBLE, A SINGLE ROW OF SILT FENCE WILL BE
 INSTALLED AROUND THE PERIMETER OF THE REMAINDER OF THE
 CONSTRUCTION AREA. ADJACENT STORMWATER
 CATCH BASINS AND INLETS WILL BE PROTECTED BY COVERING
 WITH SILT FENCE MATERIAL OR
 DUST CONTROL MEASURES WILL BE IMPLEMENTED BY DEMOLITION
 CONTRACTOR AS NEEDED TO SUPPRESS DUST
 LEVELS TO BELOW THOSE LISTED IN 29 CFR 1926.55.
 ALL WASTE/DEBRIS LEAVING THE SITE WILL BE IN CLOSED OR
 COVERED CONTAINERS.
 DEMOLITION CONTRACTOR WILL UTILIZE GOOD CONSTRUCTION
 MANAGEMENT TECHNIQUES TO CONTAIN ALL
 STORMWATER RUNOFF WHICH HAS COME INTO CONTACT WITH
 CONSTRUCTION DEBRIS. DEMOLITION CONTRATOR?S
 PERSONNEL WILL INSPECT THE PERIMETER OF THE
 CONSTRUCTION AREA DAILY TO ENSURE THAT SEDIMENT LADEN
 WATER DOES NOT LEAVE THE SITE.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 MOBILE: (561) 818-1322
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING