Plan Review Notes For Permit 16050249 |
Permit Number |
16050249 |
|
Review Stop |
M |
Sequence Number |
3 |
|
Notes |
Date |
Text |
2016-08-15 11:57:03 | 3RD REVIEW FBC-2014 MECHANICAL | | PERMIT #16050249 | | 8/15/16 | | | | 1) THE ENERGY/GAUGE SUBMITTAL INDICATES AHU-5 TO HAVE A | | CAPACITY OF 284 MBH HOWEVER THE AC SCHEDULE INDICATES | | 316 MBH- PLEASE CORRECT ONE OR THE OTHER. | | | | 2) THE AC SYSTEMS APPEAR TO BE OVERSIZED AND NOT IN | | COMPLIANCE WITH SECTION C403.2.2 FBC-14 ENERGY | | CONSERVATION. THE AC CALCULATIONS INDICATE A TOTAL HEAT | | LOAD OF 62.8 TON HOWEVER THE SCHEDULE INDICATES 75 TONS | | OF COOLING. THE CALCULATIONS INDICATE A HEATING COIL | | REQUIREMENT OF 76 KW, HOWEVER THE SCHEDULE INDICATES 95 | | KW ELECTRIC HEAT SELECTED- SEE SECTION C403.2.2 FBC-14 | | ENERGY CONSERVATION. | | | | 3) THE ZONE LOCATIONS INDICATED IN THE AC CALCULATIONS- | | EAST, WEST, CENTRAL, LOCKERS, STR COND DO NOT MATCH THE | | AHU LOCATIONS SHOW IN THE SCHEDULE- SOUTH, STRENGTH, | | NORTH, HOSPITALITY, & SOUTH O/A. PLEASE CORRELATE THE | | CALCS WITH THE SYSTEMS AND THE PLANS. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | | | |
|