Date |
Text |
2016-05-17 08:08:41 | 1ST REVIEW: FBC 2014 MECHANICAL |
| PERMIT #16050249 |
| 5/17/16 |
| |
| 1) PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE |
| LOCKER ROOMS AND BATH ROOMS, AND PROVIDE HVAC CONTROL |
| SEQUENCING DETAILS- SEE TABLE 403.3 FBC-14 MECHANICAL |
| AND ASHRAE 62.1-2010. |
| |
| 2) SHEET M0.02: REFER TO TABLE D-1 ASHRAE 90.1 AND |
| CORRECT THE DRY AND WET BULB TEMPERATURES FOR WEST PALM |
| BEACH SHOWN ON THE PLAN AND IN THE AC CALCULATIONS. |
| |
| 3) SUBMIT A 2ND SET OF ENERGY AND AC CALCULATIONS, AND |
| COMPLETE THE MANDATORY REQUIREMENTS CHECKLIST ON PAGE |
| 11 OF THE ENERGY SUBMITTAL. |
| |
| 4) SHEETS M1.01, M1.02, & M1.03: PLEASE LABEL THE O/A |
| INTAKES A) PROVIDE SHUTOFF DAMPER CONTROLS FOR THE O/A |
| AND EXHAUST DUCTS.- SECTION C403.2.4.4 FBC-14 ENERGY |
| CONSERVATION. B) VERIFY COMPLIANCE WITH SECTIONS 401.4 |
| AND 501.3.1 FBC-14 MECHANICAL - REQUIRED CLEARANCES FOR |
| O/A INTAKES AND EXHAUST OUTLETS. C) INDICATE HOW THE |
| O/A INLET AND EXHAUST OUTLET OPENINGS WILL PROTECTED IN |
| COMPLIANCE WITH SECTIONS 401.5 AND 501.3.2 , AND |
| PROVIDE SUBMITTALS APPROVED WITH SIGNATURE BY THE |
| DESIGN PROFESSIONAL. |
| |
| 5) M1.01, M1.02, M1.03: PROVIDE DUCT SMOKE DETECTORS IN |
| THE RETURN AIR SYSTEMS OF ALL SYSTEMS RETURNING OVER |
| 2000 CFM'S- SECTION 606.2.1. INDICATE CONTROLS |
| OPERATION AND SUPERVISION OF THE DETECTORS, AND PROVIDE |
| A SUBMITTAL APPROVED WITH SIGNATURE BY THE DESIGN |
| PROFESSIONAL, |
| |
| 6) M1.01 & M1.02: AHU-4 SHALL NOT SUPPLY AIR TO STAIR |
| #1- REFER TO SECTION 1022.6 FBC-14 BUILDING: THE |
| INTERIOR EXIT STAIRWAY AND RAMP VENTILATION SYSTEMS |
| SHALL BE INDEPENDENT OF OTHER BUILDING VENTILATION |
| SYSTEMS. |
| |
| 7) M1.01: PROVIDE AN INDEPENDENT EXHAUST SYSTEM FOR THE |
| JANITOR ROOM- SECTION 501.2. |
| |
| 8) M1.01, LAUNDRY ROOM: SUBMIT MANUFACTURER'S |
| SPECIFICATIONS FOR THE DRYERS WITH APPROVAL SIGNATURE |
| BY THE DESIGN PROFESSIONAL- REFER TO SECTION 504.7 AND |
| REVISE THE PLAN TO SHOW COMPLIANCE. |
| 504.7 COMMERCIAL CLOTHES DRYERS. |
| THE INSTALLATION OF DRYER EXHAUST DUCTS SERVING |
| COMMERCIAL CLOTHES DRYERS SHALL COMPLY WITH THE |
| APPLIANCE MANUFACTURER'S INSTALLATION INSTRUCTIONS. |
| EXHAUST FAN MOTORS INSTALLED IN EXHAUST SYSTEMS SHALL |
| BE LOCATED OUTSIDE OF THE AIRSTREAM. IN MULTIPLE |
| INSTALLATIONS, THE FAN SHALL OPERATE CONTINUOUSLY OR BE |
| INTERLOCKED TO OPERATE WHEN ANY INDIVIDUAL UNIT IS |
| OPERATING. DUCTS SHALL HAVE A MINIMUM CLEARANCE OF 6 |
| INCHES (152 MM) TO COMBUSTIBLE MATERIALS. CLOTHES DRYER |
| TRANSITION DUCTS USED TO CONNECT THE APPLIANCE TO THE |
| EXHAUST DUCT SYSTEM SHALL BE LIMITED TO SINGLE LENGTHS |
| NOT TO EXCEED 8 FEET (2438 MM) IN LENGTH AND SHALL BE |
| LISTED AND LABELED FOR THE APPLICATION. TRANSITION |
| DUCTS SHALL NOT BE CONCEALED WITHIN CONSTRUCTION. |
| A) INDICATE THE GAGE OF THE DRYER EXHAUST DUCT. B) |
| INDICATE HOW MAKE-UP MAIR IS BEING RPOVIDE AND PROVIDE |
| A CALCULATION. |
| |
| 9) M1.03: THE LABEL FOR AHU-4 IS MISSING. |
| |
| 10) M3.01: PROVIDE THE WIND LOAD DESIGN CRITERIA ON THE |
| PLAN- SECTION 301.15 FBC-14 MECHANICAL. |
| |
| 11) INDICATE HOW ACC/AHU-6 WAS SIZED- PROVIDE A |
| CALCULATION. |
| |
| 12) M0.02: A) PROVIDE THE CORRECT SPELLING FOR |
| "CONDENSER" IN THE SCHEDULE. B) PROVIDE THE EFFICIENCY |
| RATINGS FOR THE ACC SYSTEMS 1-5 IN THE SCHEDULE. |
| |
| 13) PROVIDE CONDENSATE DISPOSAL PLANS FOR ALL SYSTEMS- |
| SECTION 307. |
| |
| 14) REFER TO SECTION C403.2.7.2 FBC-14 ENERGY |
| CONSERVATION AND PROVIDE CONSTRUCTION DETAILS AND |
| MATERIALS COMPLIANCE FOR THE MECHANICAL CLOSETS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |