Date |
Text |
2016-09-06 18:58:28 | PLAN |
| REVIEW COMMENTS |
| |
| 2ND REVIEW: FBC FIFTH EDITION (2014) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) SUBMIT TWO SETS OF ENERGY CODE COMPLIANCE FORMS THAT |
| HAVE THE SIGNATURES OF THE PREPARER AND THE |
| OWNER/AGENT. FBC ENERGY CONSERVATION R103 - COMPLETED |
| FORMS R402 OR R405 ARE ACCEPTABLE. |
| |
| 2) PROVIDE SIGNED AND SEALED CALCULATIONS TO VERIFY |
| THAT THE (2) 2 X 12 BEAM SPANNING 15 FEET CAN SUPPORT |
| THE 40 PSF LIVE LOAD AND DEAD LOAD OF THE BALCONY. FBC |
| 107.2.1.3 |
| |
| 3) THE PLANS DO NOT SPECIFY ANY CROSS BRACING OF THE |
| DECK OR THE 4 X 4 POSTS THAT ARE SUPPORTING THE DECK. |
| PROVIDE SIGNED AND SEALED CALCULATIONS TO SHOW THAT THE |
| 4" X 4" X 8' WOOD POSTS ARE CAPABLE OF RESISTING THE |
| LATERAL LOADS, WIND LOADS, ETC. |
| |
| 4) FBC 107.3.4 - PROVIDE TWO SETS OF PRODUCT APPROVALS |
| FOR THOSE PRODUCTS WHICH ARE REGULATED BY DCA RULE 9N-3 |
| THAT HAVE BEEN REVIEWED AND APPROVED IN WRITING BY THE |
| DESIGNER OF RECORD. PROVIDE TWO COMPLETE PRODUCT |
| APPROVALS WITH FL OR NOA NUMBERS INCLUDING INSTALLATION |
| INSTRUCTIONS AND MAXIMUM DESIGN PRESSURES FOR THE RIDGE |
| OR ROOF VENT, THE SIDING (IF IT IS ALUMINUM OR VINYL) |
| AND THE ALUMINUM SOFFIT MATERIAL. |
| |
| 5) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE |
| SINGLE OUTSWING DOOR HAS A MAXIMUM NEGATIVE DESIGN |
| PRESSURE FOR THE DOOR OF (-50 PSF) IS NOT ADEQUATE FOR |
| THE DOOR LOCATED ON THE FIRST FLOOR IN THE END ZONE, |
| WHICH REQUIRES -54.8 PSF. SUBMIT CORRECT PRODUCT |
| APPROVALS. FBC-R301.2.1 |
| |
| 6) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE |
| SECTIONAL GARAGE DOOR HAS MAXIMUM DESIGN PRESSURES OF |
| +36, -42.5 PSF WHICH ARE NOT ADEQUATE. THE PLANS |
| SPECIFY THAT THE REQUIRED PRESSURES ARE +37.5, -42.5 |
| PSF. SUBMIT CORRECT PRODUCT APPROVALS. FBC-R301.2.1 |
| |
| 7) SUBMIT TWO COPIES OF THE PRODUCT EVALUATION REPORTS |
| WITH INSTALLATION REQUIREMENTS FOR THE OPEN CELL SPRAY |
| FOAM INSULATION THAT IS SPECIFIED ON THE PLANS. FBC |
| R316 |
| |
| 8) THE SECOND FLOOR OF THIS STRUCTURE IS CONDITIONED |
| SPACE. THE FLOOR/CEILING ASSEMBLY ABOVE THE GARAGE IS |
| REQUIRED TO HAVE THERMAL INSULATION. FBC ENERGY |
| CONSERVATION R402.1 |
| |
| 9) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT A |
| RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| COMMENTS HAS BEEN ADDRESSED. |
| |
| |