2016-05-02 16:24:35 | 1ST REVIEW: FBC 2014 MECHANICAL |
| PERMIT #16041215 |
| 5/2/16 |
| |
| 1) THE IAQ PROCEDURE FOR OUTDOOR AIR INTAKE REQUIRES |
| SUBMITTAL OF DESIGN DOCUMENTATION AS INDICATED IN |
| SECTION 6.3.6 ASHRAE 62.1-2010: |
| 6.3.6 DOCUMENTATION. WHEN THE IAQ PROCEDURE IS USED, |
| THE FOLLOWING INFORMATION SHALL BE INCLUDED IN THE |
| DESIGN DOCUMENTATION: THE CONTAMINANTS OF CONCERN |
| CONSIDERED IN THE DESIGN PROCESS, THE SOURCES AND |
| EMISSION RATES OF THE CONTAMINANTS OF CONCERN, THE |
| CONCENTRATION LIMITS AND EXPOSURE PERIODS AND THE |
| REFERENCES FOR THESE LIMITS, AND THE ANALYTICAL |
| APPROACH USED TO DETERMINE VENTILATION RATES AND AIR |
| CLEANING REQUIREMENTS. THE CONTAMINANT MONITORING AND |
| OCCUPANT AND/OR VISITOR EVALUATION PLANS SHALL ALSO BE |
| INCLUDED IN THE DOCUMENTATION. |
| PLEASE REVIEW ALL SUB-SECTIONS LISTED UNDER 6.3 AND |
| SHOW COMPLIANCE. |
| |
| 2) SHEET M-001: PLEASE UPDATE THE ASHRAE 62.1-2007 |
| REFERENCE SHOWN IN THE O/A TABLE TO THE CURRENT 2010 |
| EDITION. |
| |
| 3) M-001: IT APPEARS THAT THE SYSTEM DATA IN THE AC |
| SCHEDULE FOR AHU-11 IS LISTED UNDER AHU-12 AND VICE |
| VERSA. PLEASE REFER TO THE SUBMITTED AC SUMMARY |
| CALCULATIONS, AND THE AC LAYOUT PLAN ON SHEET M-101 |
| WHERE THE SYSTEMS APPEAR TO BE MISLABELED. |
| |
| 4) M-001: EDUCATIONAL SCIENCE LABORATORIES REQUIRE |
| EXHAUST SYSTEMS AT A RATE OF 50CFM'S PER SF. PLEASE |
| CLARIFY WHAT TYPE OF ACTIVITIES WILL BE CONDUCTED IN |
| THE SCIENCE ROOM, AND ALSO INDICATE IF THERE WILL BE AN |
| ART CLASSROOM WHICH ALSO REQUIRES AND INDEPENDENT |
| EXHAUST SYSTEM. REVISE THE PLANS TO SHOW COMPLIANCE. |
| |
| 5) M-001: THE O/A SCHEDULE LISTS #122 AS "LARGE SPACE |
| IN THE CENTER". PLEASE BE MORE SPECIFIC REGARDING THE |
| USE OF THIS AREA. WHY WOULD THE O/A RATE FOR THIS AREA |
| BE ANY LESS THAN THE PIAZZA? |
| |
| 6) M-003: PLEASE CORRECT THE HVAC DESIGN TABLE |
| INDICATING NO DUCT SMOKE DETECTORS. |
| |
| 7) M-101: THE PLAN INDICATES 2360 CFM'S OF SUPPLY AIR |
| FOR THE 4-TON SYSTEM WHICH IS CAPABLE OF PRODUCING |
| MAXIMUM 1600 CFM'S ACCORDING TO THE AC SCHEDULE. |
| |
| 8) M-101: THE EXHAUST IN ROOM 112A NEEDS TO BE |
| INCREASED TO ACCOMODATE THE LOCKERS OR DRESSING AREA- |
| TABLE 6-4 ASHRAE 62.1-10. |
| |
| 9) M-102: PLEASE CLARIFY THE USE OF THE MOTORIZED |
| DAMPER IN THE COMMON WALL BETWEEN CLASSROOMS 202 & 203. |
| |
| 10) A050: REFER TO SECTION C101.4.4 FBC-14 ENERGY |
| CONSERVATION. THE BUILDING CODE DATA INDICATES THE |
| PROJECT IS A "CHANGE OF OCCUPANCY". PLEASE PROVIDE |
| ENERGY CALCULATIONS. |
| |
| 11) PROVIDE AC CALCULATIONS FOR THE WAC-1 SYSTEM. |
| |
| 12) REFER TO SECTIONS C403.2.7.2 AND C403.2.7.3 FBC |
| ENERGY CONSERVATION AND REPLACE THE WOOD DOORS ON THE |
| MECHANICAL CLOSETS WITH NON-COMBUSTIBLE DOORS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |