2016-04-28 14:27:08 | 1ST REVIEW: FBC 2014 MECHANICAL |
| PERMIT #16041113 |
| 4/28/16 |
| |
| 1) CONCERNING THE ARCHITECT'S NOTE ON SHEET A-1 THAT |
| STATES "ALL MECHANICAL WORK SHALL BE DONE UNDER A |
| SEPARATE PERMIT AND SHOWN ON SEPARATE PERMIT DRAWINGS |
| PREPARED BY OTHERS", PLEASE REFER TO SECTION 107.3.4 |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. |
| |
| 107.3.4.2 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS |
| SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| FOR REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR |
| DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE |
| REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE |
| WHO SHALL REVIEW THEM AND FORWARD THEM TO THE BUILDING |
| OFFICIAL WITH A NOTATION INDICATING THAT THE DEFERRED |
| SUBMITTAL DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE |
| IN GENERAL CONFORMANCE TO THE DESIGN OF THE BUILDING. |
| THE DEFERRED SUBMITTAL ITEMS SHALL NOT BE INSTALLED |
| UNTIL THE DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN |
| APPROVED BY THE BUILDING OFFICIAL. |
| |
| IT APPEARS THAT ACCORDING TO THE ABOVE SECTION THAT THE |
| ARCHITECT OF RECORD SHALL, AT A MINIMUM, REVIEW AND |
| APPROVE THE DEFERRED MECHANICAL PLANS, OR THOSE PANS |
| SHALL BE SUBMITTED WITH UNDER THIS PERMIT APPLICATION. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |