2016-09-08 17:34:58 | ****PROVISOS**** |
| |
| SAMANTHA HILL |
| BUILDING PLANS EXAMINER |
| [email protected] |
| 561-805-6724 |
| |
| A. PROVISO: TCO AT EACH PHASE IS SUBJECT TO APPROVAL OF |
| THE BUILDING OFFICIAL (OR HIS REPRESENTATIVE) AND FIRE |
| DEPARTMENT, AND MAY INCLUDE ITEMS NOT WITHIN THE SCOPE |
| OF THIS REVIEW. |
| |
| A TCO REQUEST FORM AND FEE WILL BE REQUIRED. THIS FORM |
| IS AVAILABLE UPON REQUEST BY EMAIL. |
| |
| B. PROVISO, LIFE SAFETY PLANS REFER TO LIFE SAFETY |
| SYSTEMS DETAILED ON FMEP SHEETS (LIFE SAFETY TCO NOTES) |
| WHICH HAVE NOT BEEN PROVIDED AT THIS TIME. COMPLIANCE |
| WITH ALL LIFE SAFETY AND ACCESSIBILITY REQUIREMENTS IS |
| REQUIRED FOR EACH PHASE. FMEP SHEETS AND LIFE SAFETY |
| SYSTEM SPECIFICS WILL BE REVIEWED AT TIME OF INTERIOR |
| BUILDOUT PERMIT APPLICATION. |
| |
| C. PROVISO, PERMIT WILL BE ISSUED AT CONTRACTOR'S RISK. |
| |
| FBC105.13 PHASED PERMIT APPROVAL. AFTER SUBMITTAL OF |
| THE APPROPRIATE CONSTRUCTION DOCUMENTS, THE BUILDING |
| OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT FOR THE |
| CONSTRUCTION OF FOUNDATIONS OR ANY OTHER PART OF A |
| BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION DOCUMENTS |
| FOR THE WHOLE BUILDING OR STRUCTURE HAVE BEEN |
| SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE FOUNDATION |
| OR OTHER PARTS OF A BUILDING OR STRUCTURE SHALL PROCEED |
| AT THE HOLDER 'S OWN RISK WITH THE BUILDING OPERATION |
| AND WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE |
| STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE REQUIRED |
| TO MEET THE REQUIREMENTS OF THE TECHNICAL CODES. THIS |
| PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE, ALL |
| OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION MUST |
| BE SECURED PRIOR TO THIS PROVISION BEING APPLIED. |
| |
| D. INFORMATIONAL ONLY, A CURSORY REVIEW HAS BEEN |
| PERFORMED ON THE LIFE SAFETY PLAN AND ACCESSIBILITY. |
| DIMENSIONS, DOOR TYPES, HARDWARE SCHEDULE, ETC. IS |
| REQUIRED FOR A COMPREHENSIVE REVIEW WHICH WILL BE |
| PERFORMED AT TIME OF INTERIOR BUILDOUT PERMIT REVIEW. |
| |
| E. PROVISO, THIS STUCTURE SERVES A BUILDING WHICH HAS |
| NOT BEEN REVIEWED BY THIS DEPARTMENT (TRAIN STATION). |
| ACCESSIBLE ROUTE IN COMPLIANCE WITH FBC 5TH EDITION |
| ACCESSIBILITY IS REQUIRED AND WILL BE VERIFIED IN THE |
| FIELD. |
| |
| |