2016-06-02 12:21:32 | 2ND REVIEW: FBC 2014 MECHANICAL |
| PERMIT #16040583 |
| 6/2/16 |
| |
| 1) SUBMIT AC CHANGEOUT FORMS AND AHRI CERTIFICATES FOR |
| THE SYSTEMS BEING REPLACED AS INDICATED ON SHEET M-2. |
| |
| 2) THE SCOPE OF WORK FOR MECHANICAL IS NOT CLEAR: THE |
| 1ST FLOOR AND MEZZANINE DUCT LAYOUT PLANS ON M-1 ARE |
| LABELED AS "EXISTING", HOWEVER THE HVAC NOTES ON M-2 |
| APPEAR TO INDICATE ALL NEW DUCT WORK, EXHAUST FANS, AND |
| OTHER COMPONENTS. PLEASE CLARIFY AND USE LETTERED |
| SYMBOLS SUCH AS "E" FOR EXISTING, "N" FOR NEW, "R" FOR |
| RELOCATED AT DIFFUSER AND GRILL LOCATIONS, USE DOTTED |
| LINES TO INDICATE REMOVED OR RELOCATED DUCTS AND SOLID |
| LINES TO INDICATE NEW, REPLACED, OR RELOCATED DUCTS. IN |
| REGARD TO THE EXISTING PLANS PLEASE REVIEW THESE |
| COMMENTS: |
| |
| A) LABEL THE 8X6 DUCT IN THE OFFICE 108 AND THE CFMS. |
| B) PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE |
| OPEN AREA SHOWN ON THE 1ST FLOOR, CLARIFY WHY EXHAUST |
| IS NEEDED (WHAT PROCESSES OR WORK IS BEING CONDUCTED IN |
| THE ROOM?), AND LABEL THE EXHAUST DUCT TERMINATION |
| LOCATION. |
| C) PROVIDE WIND LOAD DEIGN CRITERIA AND ENGINEERED |
| DETAILS FOR INSTALLATION OF THE NEW ROOF TOP CONDENSER |
| AND CONDENSER STANDS, AND EXHAUST TERMINATION CAPS- |
| SECTION 301.15. |
| D) THE TOILET ROOM EXHAUST FANS SHALL HAVE CAPACITIES |
| OF 70 CFMS EACH PER TABLE 403.3 FBC-14 MECHANICAL. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |