Date |
Text |
2016-12-02 10:48:56 | 3RD REVIEW FBC-2014 MECHANICAL |
| PERMIT #16040415 |
| 12/2/16 |
| |
| 1) SHEETS M-1 & M-2.1: IT APPEARS THAT THE RTU |
| SCHEDULE, AND THE ENERGY AND AC CALCULATIONS ARE |
| INDICATING NEW UNITS ARE BEING INSTALLED. PLEASE |
| CORRECT THE MECHANICAL ROOF PLAN INDICATING EXISTING. |
| |
| 2) CLARIFY IF THE DUCT HEATERS ARE NEW OR EXISTING AND |
| LABEL THEM ACCORDINGLY. IF NEW UNITS ARE BEING |
| PROVIDED, PLEASE PROVIDE AN EQUIPMENT SCHEDULE. |
| |
| 3) M-1, FAN SCHEDULE: PROVIDE THE CONTROL SEQUENCE FOR |
| EF-7. |
| |
| 4) M-1 & M-2.0A: THE EXHAUST CALCULATION IS SPECIFYING |
| EXHAUST RATES BASED ON SECTION 502.8.1.1 FBC-14 |
| MECHANICAL. PLEASE REVIEW AND SHOW COMPLIANCE WITH |
| ITEMS #1-7 UNDER 502.8.1.1, AND ALSO REFER TO SECTION |
| 510.8 FOR EXHAUST DUCT REQUIREMENTS AND SHOW DETAILS ON |
| THE PLAN. |
| |
| 5) PLEASE REFER TO TABLE 7-1 ASHRAE 170- 2008 AND |
| PROVIDE THE DESIGN PARAMETERS FOR THE SOILED UITILITY |
| AND MEDICAL WASTE ROOMS. SHOW PRESSURE RELATIONSHIPS |
| AND REQUIRED OUTDOOR AND TOTAL AIR CHANGES RO EACH |
| ROOM. |
| |
| 6) PROVIDE AIR BALANCE CALCULATIONS THAT INCLUDE THE |
| NEW EXHAUST VENTILATION SYSTEMS. |
| |
| 7) 2ND REQUEST FOR THE DEFINITION OF "HT" STORAGE ROOM |
| AND WHAT MATERIALS ARE BEING STORED IN THE ROOM. AS |
| PREVIOUSLY NOTED EXHAUST VENTILATION MAY BE REQUIRED |
| AND RECIRCULATION IOF AIR PROHIBITED. |
| |
| 8) M2.0A: SHOW THE DUCT DROP AND DUCT PLAN FOR OAU-1. |
| |
| 9) M2.0A: THERE APPEARS TO BE A MISSING FIRE DAMPER |
| WHERE THE 8X6 DUCT IS PENETRATING THE FIRE-RATED PD |
| RECORDS ROOM WALL. |
| |
| 10 ) A RESPONSE NARRATIVE WAS NOT SUBMITTED WITH THE |
| CORRECTED PLANS. PLEASE PROVIDE A RESPONSE NARRATIVE |
| ADDRESSING THESE REVIEW COMMENTS. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |