2016-04-14 13:57:23 | 1ST REVIEW: FBC 2014 MECHANICAL |
| PERMIT #16040412 |
| 4/14/16 |
| |
| 1) SHEET M1.0: THE OUTSIDE AIR CALULATIONS ARE BASED ON |
| THE OUTDATED FMC- 2010. THE CURRENT CODE IN EFFECT IS |
| THE FBC- 2014 MECHANICAL: PLEASE REVIEW AND UPDATE. |
| 2) M1.0: PLEASE INDICATE THE OFFICE OR ROOM NUMBERS IN |
| THE OUTSIDE AIR SCHEDULE AND INCLUDE CALULATIONS FOR |
| ALL ROOMS AND SPACES INCLUDING THE EXAMINATION AND |
| MEDICAL PROCEDURE ROOMS- SEE TABLE 403.3. PLEASE NOTE |
| THAT THE "WATER TREATMENT STORAGE" ROOMS LISTED IN THE |
| CALCULATIONS DO NOT APPEAR TO BE IN THE SCOPE OF WORK |
| FOR THIS PROJECT: PLEASE CLARIFY. |
| 3) M1.0: PROVIDE EXHAUST VENTILATION CALCULATIONS FOR |
| THE SOILED UTILITY, MED WASTE, AND LAB PREP ROOMS. |
| PLEASE NOTE THAT NO EXHAUST HAS BEEN PROVIDED FOR THE |
| LAB PREP ROOM- SEE TABLE 403.3 AND CLARIFY IF THERE IS |
| LAB WORK OR CHEMICAL STORAGE IN THE THIS ROOM- SEE |
| TABLE 6-4 ASHRAE 62.1-2010. |
| 4) D1.0: PLEASE PROVIDE A SCOPE OF WORK FOR MECHANICAL |
| DEMOLITION WITH CORREPONDING DRAWINGS AND DETAILS. |
| 5) M-2.0A: THE 10" FLEX DUCTS SUPPLYING 405 CFMS EACH |
| TO THE CONFERENCE ROOM ARE UNDERSIZED PER ACCA MANUAL D |
| SIZING METHODS FOR LOW PRESSURE SYSTEMS. |
| 6) PROVIDE A MECHANICAL ROOF PLAN SHOWING THE LOCATIONS |
| OF ALL ROOF TOP EQUIPMENT- RTU'S, EXHAUST FANS, AIR |
| INTAKES ETC- SEE SECTIONS 401.5 AND 501.3.1 FOR |
| REQUIRED CLEARANCE DISTANCES AND PLACE MEASUREMENTS ON |
| THE PLAN TO VERIFY COMPLIANCE. SUBMIT NOA'S OR FL. |
| PRODUCT APPROVALS FOR THE ROOF TOP FANS, AND FAN AND |
| RTU CURBS REVIEWED AND APPROVED WITH SIGNATURE BY THE |
| EOR. PLEASE NOTE THAT GUARDS WILL BE REQUIRED FOR ALL |
| SERVICEABLE EQUIPMENT ON THE ROOF WITHIN 10' OF A ROOF |
| EDGE I.E. EF-6. |
| 7) INDICATE THE USE OF EF-6 ON THE PLAN AND PROVIDE |
| EXHAUST VENTILATION CALCULATIONS, MAKE-UP AIR, A |
| VENTING DIAGRAM, AND MANUFACTURER'S SPECIFICATIONS FOR |
| THE EXHAUST FAN AND DUCT WORK. |
| 8) M-3.1: REFER TO SECTION 301.15 AND PROVIDE WIND LOAD |
| DESIGN CRITERIA AND COMPLETE ENGINEERED DETAILS FOR TIE |
| DOWN OF THE RTUS, FANS, AND CURBS TO THE ROOF |
| STRUCTURE. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |