2016-03-03 13:18:21 | 1) THE SUBMITTED PLAN IS UNCLEAR AS TO THE SCOPE OF | | WORK TO BE DONE.WILL THERE BE ANY TUNNELING REQUIRED | | UNDER THE EXISTING SLAB? INDICATE ON THE PLANS. | | 2) PLUMBING REPAIR TUNNEL WORK | | A CLEAR AND LEGIBLE SANITARY RISER DIAGRAM SHALL BE | | SUBMITTED SHOWING ALL PIPE SIZES, CONNECTION POINTS TO | | EXISTING PIPING, HOW THE NEW PIPE WILL BE SUPPORTED, | | THE TYPE OF ADAPTERS USED FOR THE CONNECTIONS TO | | EXISTING PIPE, AND THE LOCATIONS OF REQUIRED CLEANOUTS. | | DETAILS AND BACKFILLING PROCEDURES SHALL BE SUBMITTED | | THAT CLEARLY SHOW HOW THE STRUCTURAL INTEGRITY OF THE | | CONCRETE SLAB WILL BE MAINTAINED DURING EXCAVATION AND | | BACKFILLING. STRUCTURAL FOAM IS NOT PERMITTED FOR | | BACKFILL BELOW GROUND PER THE FLORIDA BUILDING CODE, | | RESIDENTIAL, SECTION 318.8 AND THE FLORIDA BUILDING | | CODE, BUILDING, SECTION 2603.9. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|