Plan Review Notes
Plan Review Notes For Permit 16030058
Permit Number 16030058
Review Stop B
Sequence Number 2
Notes
Date Text
2016-05-11 13:15:07****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FROM PREVIOUS LIST:
  
 10. PROVIDE A SITE PLAN WHICH SHOWS THE PROPOSED
 UNIFIED PARCEL, BUILDING OUTLINE, AND DISTANCE OF THE
 EXTERIOR WALLS TO THE PROPERTY LINE OR CENTERLINE OF
 PUBLIC WAY TO SHOW COMPLIANCE WITH FBC TABLE 705.8.
  
 2ND REVIEW, APPLICABLE DIMENSIONS ARE NOT SHOWN. PLEASE
 REVISE PLAN TO SHOW THE DISTANCE FROM THE PROPOSED
 BUILDING TO THE PROPERTY LINE OR TO CENTERLINE OF
 PUBLIC WAY. IF ANY EXCEPTIONS ARE USED, PLEASE NOTE.
 SEE FBC TABLE 602, 705.8. THE DISTANCE TO PROPERTY LINE
 (OR CENTERLINE OF PUBLIC WAY) IS NOT CLEAR. THE WIDTH
 OF THE PUBLIC WAY ON EACH SIDE SHOULD BE SHOWN SO
 COMPLIANCE IS CLEAR.
  
 11. SEE GEOTECHNICAL REPORT, SECTION 7.2.2, NOTE 18, AN
 NV5 SHOULD PROVIDE FULL TIME QUALITY CONTROL INSPECTION
 TO DOCUMENT THE EXCAVATION AND GROUTING OF EACH PILE
 AND TO PROVIDE, IN CONJUNCTION WITH A LICENSED OFFICE
 ENGINEER, ANY NECESSARY FIELD ADJUSTMENTS OF PILE TIP
 ELEVATIONS. DOES APPLICANT INTEND TO ACCEPT THIS
 RECOMMENDATION? IF NOT, WHAT OTHER PROVISIONS WILL BE
 MADE FOR QUALITY CONTROL AND TO ADDRESS 2014 FBC-B
 1810.3.5.2.2 (SEE COMMENT BELOW).
  
 RESPONSE LETTER STATES THAT OWNERSHIP HAS ADVISED THE
 DESIGN TEAM THEY WILL ADDRESS THIS ISSUE DIRECTLY WITH
 THE APPROPRIATE BUILDING OFFICIAL. THIS IS TO BE
 ADDRESSED PRIOR TO ISSUANCE.
  
 12. SEE GEOTECHNICAL REPORT, SECTION 8.0 REGARDING
 SOILS ENGINEER RECOMMENDATION THAT THEY REVIEW THE
 FOUNDATION DESIGN; HAS THIS BEEN DONE? PROVIDE A LETTER
 OR SHOP DRAWING REVIEW STAMP, FBC 107.
  
 13. REGARDING THE WIND TUNNEL TEST, PROVIDE ONE OF THE
 FOLLOWING:
  
 A. ENGINEERING IS TO BE SIGNED AND SEALED BY A FLORIDA
 REGISTERED PE, FS 471, OR
 B. ENGINEER OF RECORD IS TO PROVIDE A SHOP DRAWING
 REVIEW OR A LETTER WHICH STATES THAT HE ACCEPTS THE
 REPORT'S FINDINGS AND FINDS THAT THE TEST WAS DONE WITH
 STANDARD ENGINEERING PRACTICE
  
 RESPONSE LETTER STATES THAT OWNERSHIP HAS ADVISED THE
 DESIGN TEAM THEY WILL ADDRESS THIS ISSUE DIRECTLY WITH
 THE APPROPRIATE BUILDING OFFICIAL. THIS IS TO BE
 ADDRESSED PRIOR TO ISSUANCE.
  
 *****
 PLEASE CONTACT ME REGARDING A POSSIBLE PROVISO FOR THE
 ABOVE ITEMS.
 *****
  
 THIS PERMIT WILL BE ISSUED WITH THE FOLLOWING PROVISOS:
  
 ****PROVISOS****
 ****ISSUED AT CONTRACTOR?S RISK****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. FBC 105.13 PHASED PERMIT APPROVAL. AFTER SUBMITTAL
 OF THE APPROPRIATE CONSTRUCTION DOCUMENTS, THE BUILDING
 OFFICIAL IS AUTHORIZED TO ISSUE A PERMIT FOR THE
 CONSTRUCTION OF FOUNDATIONS OR ANY OTHER PART OF A
 BUILDING OR STRUCTURE BEFORE THE CONSTRUCTION DOCUMENTS
 FOR THE WHOLE BUILDING OR STRUCTURE HAVE BEEN
 SUBMITTED. THE HOLDER OF SUCH PERMIT FOR THE FOUNDATION
 OR OTHER PARTS OF A BUILDING OR STRUCTURE SHALL PROCEED
 AT THE HOLDER?S OWN RISK WITH THE BUILDING OPERATION
 AND WITHOUT ASSURANCE THAT A PERMIT FOR THE ENTIRE
 STRUCTURE WILL BE GRANTED. CORRECTIONS MAY BE REQUIRED
 TO MEET THE REQUIREMENTS OF THE TECHNICAL CODES. THIS
 PROVISION IS ONLY FOR THE FLORIDA BUILDING CODE, ALL
 OTHER AGENCY APPROVALS NECESSARY FOR CONSTRUCTION MUST
 BE SECURED PRIOR TO THIS PROVISION BEING APPLIED.
  
 2. A REPLAT IS REQUIRED FOR COMPLIANCE WITH FBC 705.8.
 WHEN AVAILABLE, PROVIDE THE BOOK AND PAGE WHERE THIS
 HAS BEEN RECORDED OR PROVIDE A COPY OF THE RECORDED
 PLAT.
  
  
  