Plan Review Notes For Permit 16020874 |
Permit Number |
16020874 |
|
Review Stop |
G |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2016-03-03 05:39:22 | 1) ALL THE PREVIOUS GAS COMMENTS HAVE NOT BEEN | | ADDRESSED. | | | | 2).SHOW THE BTU LOAD OF EACH APPLIANCE / EQUIPMENT AND | | THE TOTAL BTU LOAD ON THE SYSTEM. REFER TO THE 2014 | | FBC-FUEL GAS SECS.401.8 THRU 402.6.1 AND TABLES 402.4 | | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2413. 2ND | | REQUEST. | | | | 3).INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM | | ON THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. | | SEC. G2413.2. . 2ND REQUEST. | | | | 4).SUBMIT MANUFACTURER'S SPECIFICATION SHEETSL FOR ALL | | GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA | | 54, NFPA 58, AND FBC-2014 FUEL GAS CODE SEC. 402.2, AND | | 301.3 OR 2014 FBC-RES. SEC. G2404.3. GAS APPLIANCES | | SHALL BE LISTED AND LABELED.SUBMIT TWO COPIES OF ALL | | DOCUMENTS. | | | | 5) EACH APPLIANCE SHALL BE PROVIDED WITH A SHUTOFF | | VALVE IN ACCCORDANCE WITH THE 2014 FUEL GAS CODE | | SECS.409.5, 2ND REQUEST. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | | | |
|