Plan Review Notes For Permit 16020874 |
Permit Number |
16020874 |
|
Review Stop |
G |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2016-02-24 06:22:59 | | | 1.SHOW THE BTU LOAD OF EACH APPLIANCE / EQUIPMENT AND | | THE TOTAL BTU LOAD ON THE SYSTEM. REFER TO THE 2014 | | FBC-FUEL GAS SECS.401.8 THRU 402.6.1 AND TABLES 402.4 | | (1) THRU 402.4 (37) OR 2014 FBC-RES. SEC. G2413. | | | | 2.INDICATE THE DELIVERY PRESSURE (PSI) OF THE SYSTEM ON | | THE PLAN PER 2014 FBC-FUEL GAS SEC.402.2 OR FBC RES. | | SEC. G2413.2. . | | | | 3.SUBMIT MANUFACTURER'S SPECIFICATION SHEETS / | | INSTALLATION MANUAL FOR ALL GAS EQUIPMENT TO VERIFY | | COMPLIANCE WITH STANDARDS NFPA 54, NFPA 58, AND | | FBC-2014 FUEL GAS CODE SEC. 402.2, AND 301.3 OR 2014 | | FBC-RES. SEC. G2404.3. GAS APPLIANCES SHALL BE LISTED | | AND LABELED. | | | | 4) EACH APPLIANCE SHALL BE PROVIDED WITH A SHUTOFF | | VALVE IN ACCCORDANCE WITH THE 2014 FUEL GAS CODE | | SECS.409.5, | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | | | | | |
|