2016-02-18 15:14:37THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1. THE VALUE IS INDICATED AS $250,000.
  
 THE VALUE APPEARS TOO LOW FOR THIS PROJECT. THE VALUE
 FOR THE LIFE SAFETY PORTIONS MAY BE THIS AMOUNT THE THE
 VALUE FOR THE OVERALL PROJECT SHALL BE SUBMITTED. THE
 NEW VALUE SHOULD HAVE THE LIFE SAFETY PORTIONS REMOVED,
 I.E, UNDERGROUND FIRE LINES, FIRE SPRINKLER, FIRE
 ALARMS, ETC., AS THEY WOULD FALL UNDER SEPARATE
 PERMITS,
  
 2. FOR ALL SUBMITTED PERMIT SETS: THE SUBMITTALS ARE
 COPIES OF ORIGINALS.
  
 ORIGIANAL PLAN SETS AND ENGINEERS STAMPS SHALL BE
 ORIGINAL DOCUMENTS.
  
 61G15-30.003 MINIMUM REQUIREMENTS FOR ENGINEERING
 DOCUMENTS.
 (1) ENGINEERING DOCUMENTS ARE PREPARED IN THE COURSE OF
 PERFORMING ENGINEERING SERVICES. WHEN PREPARED FOR
 INCLUSION WITH AN APPLICATION FOR A GENERAL BUILDING
 PERMIT, THE DOCUMENTS SHALL MEET ALL ENGINEER?S
 RESPONSIBILITY RULES, SET FORTH IN CHAPTERS 61G15-31,
 61G15-32, 61G15-33, AND 61G15-34, F.A.C., AND BE OF
 SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE AND
 EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT IT
 WILL CONFORM TO THE PROVISIONS OF THE FLORIDA BUILDING
 CODE, ADOPTED IN SECTION 553.73, F.S., AND APPLICABLE
 LAWS, ORDINANCES, RULES AND REGULATIONS, AS DETERMINED
 BY THE AHJ. THE DOCUMENTS SHALL INCLUDE:
 (A) INFORMATION THAT PROVIDES MATERIAL SPECIFICATIONS
 REQUIRED FOR THE SAFE OPERATION OF THE SYSTEM THAT IS A
 RESULT OF ENGINEERING CALCULATIONS, KNOWLEDGE AND
 EXPERIENCE.
 (B) LIST FEDERAL, STATE, MUNICIPAL, AND COUNTY
 STANDARDS, CODES, ORDINANCES, LAWS, AND RULES, WITH
 THEIR EFFECTIVE DATES, THAT THE ENGINEERING DOCUMENTS
 ARE INTENDED TO CONFORM TO.
 (C) INFORMATION, AS DETERMINED BY THE ENGINEER OF
 RECORD, NEEDED FOR THE SAFE AND EFFICIENT OPERATION OF
 THE SYSTEM.
 (D) LIST ENGINEERING DESIGN CRITERIA; REFERENCE PROJECT
 SPECIFIC STUDIES, REPORTS, AND DELEGATED ENGINEERING
 DOCUMENTS.
 (E) IDENTIFY CLEARLY ELEMENTS OF THE DESIGN THAT VARY
 FROM THE GOVERNING STANDARDS AND DEPICT/IDENTIFY THE
 ALTERNATE METHOD USED TO ENSURE COMPLIANCE WITH THE
 STATED PURPOSE OF THESE RESPONSIBILITY RULES.
 (2) ENGINEERS SHALL LEGIBLY INDICATE THEIR NAME AND
 BUSINESS ADDRESS, ON ENGINEERING DOCUMENTS. ENGINEERING
 DOCUMENTS WHICH ARE ISSUED FOR PRELIMINARY OR
 CONCEPTUAL USE, SHALL CLEARLY NOTE THE INTENDED PURPOSE
 OF SUCH DOCUMENTS.
 (3) WHEN ELEMENTS OF THE PROJECT ARE SHOWN ON AN
 ENGINEERING DOCUMENT ONLY FOR INFORMATION OR
 CLARIFICATION AND THE ENGINEER DOES NOT INTEND TO
 ACCEPT RESPONSIBILITY FOR THE ELEMENTS, THE ENGINEER
 SHALL CLEARLY NOTE ON THE DOCUMENTS THE EXTENT OF HIS
 RESPONSIBILITY.
 (4) ENGINEERING DRAWINGS SHALL BE LEGIBLE AND CLEARLY
 DEFINE AND DELINEATE THE WORK IN THE PROJECT. THEY MUST
 ALSO COMPLY WITH CHAPTER 61G15-23, F.A.C., SEALS.
 (5) ENGINEERS SHALL CLEARLY NOTE ON ANY PRELIMINARY
 ENGINEERING DOCUMENTS THAT SUCH DOCUMENTS ARE NOT IN
 FINAL FORM, BUT ARE BEING TRANSMITTED TO THE PUBLIC
 AGENCY TO RECEIVE AGENCY REVIEWS, COMMENTS AND
 INTERPRETATIONS. THE DOCUMENTS MAY SUBSEQUENTLY BE
 REVISED BY THE ENGINEER TO REFLECT RESOLUTION OF ISSUES
 WITH THE PUBLIC AGENCY PRIOR TO FINAL ACTION BY THE
 AGENCY. CHANGES, REVISIONS AND MODIFICATIONS TO A
 PROJECT MAY PROMPT ADDITIONAL DOCUMENT SUBMITTAL FOR
 AGENCY APPROVAL ACTION ON THE SAME PROJECT.
  
  
 3. FOR ALL SUBMITTED PERMIT SETS:
  
 THE PERMIT SET IS NOT ORGANIZED AND BOUND. AN ORGANIZED
 REVIEW AND ACCOUNTING OF APPROVED PLANS CAN NOT BE
 COMPLETED. THE SUBMITTED PLANS SHALL BE BOUND AND
 ORGANIZED PER NFPA 1, 1.7.11 PLANS AND SPECIFICATIONS.
 1.7.11.1 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE
 PLANS AND SPECIFICATIONS TO ENSURE COMPLIANCE WITH
 APPLICABLE CODES ANDSTANDARDS.
  
 1.14 PLAN REVIEW.
 1.14.1 WHERE REQUIRED BY THE AHJ FOR NEW CONSTRUCTION,
 MODIFICATION, OR REHABILITATION, CONSTRUCTION DOCUMENTS
 AND SHOP DRAWINGS SHALL BE SUBMITTED, REVIEWED, AND
 APPROVED PRIOR TO THE START OF SUCH WORK AS PROVIDED IN
 SECTION 1.14.
 1.14.2 THE APPLICANT SHALL BE RESPONSIBLE TO ENSURE
 THAT THE FOLLOWING CONDITIONS ARE MET:
 (1) THE CONSTRUCTION DOCUMENTS INCLUDE ALL OF THE FIRE
 PROTECTION REQUIREMENTS.
 (2) THE SHOP DRAWINGS ARE CORRECT AND IN COMPLIANCE
 WITH THE APPLICABLE CODES AND STANDARDS.
 (3) THE CONTRACTOR MAINTAINS AN APPROVED SET OF
 CONSTRUCTION DOCUMENTS ON SITE.
  
 THE SUBMITTED PLANS CAN NOT BE MAINTAINED AT ANY
 LOCATION IN IT'S CURRENT DISORGANIZED/LOOSE FASHION.
  
  
 4. PROVIDE A NARRATIVE OR NOTE INDICATING THAT NO FUEL,
 GAS OR DIESEL, SHALL BE PUMPED, USED, OR STORED IN ANY
 BUILDING OR ON SITE AT ANY TIME.
  
  
 SITE PLAN SUBMITTAL -
  
 1. SHEET TK 101 - THERE IS NO REFERENCES TO ANY NFPA
 CODE REQUIREMENTS.
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.
 FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS
 OF NFPA 13, 2010 EDITION.
 FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 72, 2010 EDITION.
 CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 241, 2009 EDITION.
 FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS
 OF NFPA 10, 2010 EDITION.
 ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION.
  
 2. SHEET TK 112 - THE ACCESS ROAD SHOW A WIDTH OF 16'
 ALONG THE EAST SIDE AND 18' ALONG THE WEST. THE ACCESS
 ROAD IS THE ONLY TRAVEL LANE THROUGH THE SITE AND IS
 REQUIRED TO BE A FIRE LANE. PER NFPA 1. CHAPTER 18,
  
 18.2.3 FIRE DEPARTMENT ACCESS ROADS.
 18.2.3.1 REQUIRED ACCESS.
 18.2.3.4 SPECIFICATIONS.
 18.2.3.4.1 DIMENSIONS.
 18.2.3.4.1.1 FIRE DEPARTMENT ACCESS ROADS SHALL HAVE AN
 UNOBSTRUCTED WIDTH OF NOT LESS THAN 20 FT (6.1 M).
 18.2.3.4.1.2 FIRE DEPARTMENT ACCESS ROADS SHALL HAVE AN
 UNOBSTRUCTED VERTICAL CLEARANCE OF NOT LESS THAN 13 FT
 6 IN. (4.1 M).
 18.2.3.4.1.2.1 VERTICAL CLEARANCE SHALL BE PERMITTED TO
 BE REDUCED, PROVIDED SUCH REDUCTION DOES NOT IMPAIR
 ACCESS BY FIRE APPARATUS, AND APPROVED SIGNS ARE
 INSTALLED AND MAINTAINED INDICATING THE ESTABLISHED
 VERTICAL CLEARANCE WHEN APPROVED.
 18.2.3.4.1.2.2 VERTICAL CLEARANCES OR WIDTHS SHALL BE
 INCREASED WHEN VERTICAL CLEARANCES OR WIDTHS ARE NOT
 ADEQUATE TO ACCOMMODATE FIRE APPARATUS.
  
 3. SHEET TK 114 - ALL GATE ACCESS AND EGRESS POINTS
 SHALL BE EQUIPPED WITH KNOW KEY SWITCHES OR KNOX
 PADLOCKS. NFPA 1, CHAPTER 18,
 18.2.2.2 ACCESS TO GATED SUBDIVISIONS OR DEVELOPMENTS.
 THE AHJ SHALL HAVE THE AUTHORITY TO REQUIRE FIRE
 DEPARTMENT ACCESS BE PROVIDED TO GATED SUBDIVISIONS OR
 DEVELOPMENTS THROUGH THE USE OF AN APPROVED DEVICE OR
 SYSTEM
  
 4. SHEET RD 101 - THERE IS NO REFERENCES TO ANY NFPA
 CODE REQUIREMENTS.
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.
 FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS
 OF NFPA 13, 2010 EDITION.
 FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 72, 2010 EDITION.
 CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 241, 2009 EDITION.
 FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS
 OF NFPA 10, 2010 EDITION.
 ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION.
  
 5. SHEET RD 302 - THERE APPEARS TO BE A REFENCE TO A
 12' TRAFFIC LANE. THIS LANE IS REQUIRED TO BE A FIRE
 LANE, PER 18.2.3.4.1.1 FIRE DEPARTMENT ACCESS ROADS
 SHALL HAVE AN UNOBSTRUCTED WIDTH OF NOT LESS THAN 20 FT
 (6.1 M).
  
 6. SHEET UT 100 - THERE IS NO REFERENCES TO ANY NFPA
 CODE REQUIREMENTS.
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.
 FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS
 OF NFPA 13, 2010 EDITION.
 FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 72, 2010 EDITION.
 CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 241, 2009 EDITION.
 FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS
 OF NFPA 10, 2010 EDITION.
 ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION.
  
 7. SHEET UT 200 & 201 - THERE APPEARS TO BE NO ON- SITE
 FIRE HYDRANT ON THIS SHEET OR ANY OTHER SHEET. PROVIDE
 DETAILED FIRE FLOW REQUIREMENTS PER NFPA 1 AND THE
 REQUIRED SPACING OF FIRE HYDRANTS PER ANNEX TABLE E3.
 18.4 FIRE FLOW REQUIREMENTS FOR BUILDINGS.
 18.4.1* SCOPE.
 18.4.1.1* THE PROCEDURE DETERMINING FIRE FLOW
 REQUIREMENTS FOR BUILDINGS HEREAFTER CONSTRUCTED OR
 MOVED INTO THE JURISDICTION SHALL BE IN ACCORDANCE WITH
 SECTION 18.4.
 18.5 FIRE HYDRANTS.
 18.5.1* THE NUMBER AND TYPE OF FIRE HYDRANTS AND
 CONNECTIONS TO OTHER APPROVED WATER SUPPLIES SHALL BE
 CAPABLE OF DELIVERING THE REQUIRED FIRE FLOW AND SHALL
 BE PROVIDED AT APPROVED LOCATIONS. A.18.5.1 SEE ANNEX E
 FOR GUIDANCE DETERMINING NUMBER AND LOCATION OF FIRE
 HYDRANTS.
 18.5.2 FIRE HYDRANTS AND CONNECTIONS TO OTHER APPROVED
 WATER SUPPLIES SHALL BE ACCESSIBLE TO THE FIRE
 DEPARTMENT.
  
 8. SHEET UT 202 & 304 - THE LOCATION OF THE PROPOSED
 FDC IS NOT APPROVED. PER NFPA 24, CHAPTER 5,
  
 5.9.5 LOCATION AND SIGNAGE.
 5.9.5.1* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 AT THE NEAREST POINT OF FIRE DEPARTMENT APPARATUS
 ACCESSIBILITY OR AT A LOCATION APPROVED BY THE
 AUTHORITY HAVING JURISDICTION.
 5.9.5.2* FIRE DEPARTMENT CONNECTIONS SHALL BE LOCATED
 AND ARRANGED SO THAT HOSE LINES CAN BE ATTACHED TO THE
 INLETS WITHOUT INTERFERENCE.
  
 NFPA 13, CHAPTER 7, 8
  
 7.8.2.3 WHERE FIRE DEPARTMENT CONNECTIONS ARE USED FOR
 WATER SUPPLY, THEY SHALL BE SO LOCATED THAT THEY WILL
 NOT BE AFFECTED BY THE EXPOSING FIRE.
  
 8.17.2.4.6* FIRE DEPARTMENT CONNECTIONS SHALL BE
 LOCATED AT THE NEAREST POINT OF FIRE DEPARTMENT
 APPARATUS ACCESSIBILITY OR AT A LOCATION APPROVED BY
 THE AUTHORITY HAVING JURISDICTION.
  
 9. SHEET UT 304 - THE LOCATION OF THE EXITING FIRE
 HYDRANT IS NOT WITHIN 150' OF THE FDC. A FIRE HYDRANT
 SHALL BE LOCATED WITHIN 150' OF THE FDC; 50' WOULD BE
 OPTIMAL FOR EFFECTIVE AND EFFICIENT FIRE GROUND
 OPERATIONS.
  
 10. SHEET UT 400 - ALL TAPS INTO THE CITY WATER SUPPLY
 SYSTEM SHALL BE REVIEWED AND APPROVED BY AND THROUGH
 THE CITY OF WEST PALM BEACH ENGINEERING AND/OR
 UTILITIES DEPARTMENTS.
  
  
  
 BUILDING C SUBMITTAL
  
 1. SHEET AA 101 - UNDER APPLICABLE CODES THERE IS AN
 INCORRECT DATE (2207) FOR THE APPLICABLE CODE.
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.
  
 2. SHEET AA 102 - MEZZANINE LEVEL; ONLY ONE EXIT IS
 INDICATED. PER NFPA 101, CHAPTER 7,
  
 7.4* NUMBER OF MEANS OF EGRESS.
 7.4.1 GENERAL.
 7.4.1.1 THE NUMBER OF MEANS OF EGRESS FROM ANY BALCONY,
 MEZZANINE, STORY, OR PORTION THEREOF SHALL BE NOT LESS
 THAN TWO, EXCEPT UNDER ONE OF THE FOLLOWING CONDITIONS:
 (1) A SINGLE MEANS OF EGRESS SHALL BE PERMITTED WHERE
 PERMITTED IN CHAPTERS 11 THROUGH 43.
 (2) A SINGLE MEANS OF EGRESS SHALL BE PERMITTED FOR A
 MEZZANINE OR BALCONY WHERE THE COMMON PATH OF TRAVEL
 LIMITATIONS OF CHAPTERS 11 THROUGH 43 ARE MET.
  
 CHAPTER 38, NEW BUSINESS OCCUPANY;
  
 38.2.4.5 A SINGLE MEANS OF EGRESS SHALL BE PERMITTED
 FROM A MEZZANINE WITHIN A BUSINESS OCCUPANCY, PROVIDED
 THAT THE COMMON PATH OF TRAVEL DOES NOT EXCEED 75 FT
 (23 M), OR 100 FT (30 M) IF PROTECTED THROUGHOUT BY AN
 APPROVED, SUPERVISED AUTOMATIC SPRINKLER SYSTEM IN
 ACCORDANCE WITH 9.7.1.1(1).
  
 THE COMMON PATH OF TRAVLE APPEARS TO BE EXCEEDED AND A
 SECOND EXT IS REQUIRED.
  
 3. SHEET AA 124-127 - THE MEZZANINE STAIR DETAIL IS NOT
 PROVIDED. PROVIDE CODE COMPLIANT MEZZANINE STAIR
 DETAIL, PER NFPA 101, CHAPTER 7.
  
 4. SHEET AA 102 - THE MEZZANINE ACCESS INDICATES
 PASSAGE THROUGH THE WORKSHOP AREA TO DOOR 113 A. PER
 NFPA 101, CHAPTER 7;
  
 7.5.2 IMPEDIMENTS TO EGRESS. SEE ALSO 7.1.9 AND
 7.2.1.5.
 7.5.2.1* ACCESS TO AN EXIT SHALL NOT BE THROUGH
 KITCHENS, STOREROOMS OTHER THAN AS PROVIDED IN CHAPTERS
 36 AND 37, RESTROOMS, WORKROOMS, CLOSETS, BEDROOMS OR
 SIMILAR SPACES, OR OTHER ROOMS OR SPACES SUBJECT TO
 LOCKING, UNLESS PASSAGE THROUGH SUCH ROOMS OR SPACES IS
 PERMITTED FOR THE OCCUPANCY BY CHAPTER 18, 19, 22, OR
 23.
  
 THE MEZZANINE EXIT ACCESS SHALL NOT PASS THROUGH THIS
 ROOM AND REQUIRES CORRECTION.
  
 5. SHEET ECA 402 - THE PROPOSED EMERGENCY GENERATOR AND
 INSTALLATION SHALL BE UNDER SEPARATE PERMIT. PROVIDE AN
 INDICATING NOTE.
  
 6. SHEET FP 002 - UNDER DESIGN CRITERIA SECTION I)
 INDICATES THE FDC LOCATION THAT HAS NOT BEEN APPROVED.
 PROVED A NOTE INDICATING "WHERE APPROVED BY THE AHJ".
  
 7. SHEET FP 100 & 102 - INDICATES THAT IT RM PROTECTED
 BY A CLEAN AGENT SYSTEM. THE USE OF A CLEAN AGENT
 SYSTEM DOES ALLOW FOR THE ELIMINATION OF THE REQUIRED
 FULLY SPRINKLERD PER NFPA 13.
  
  
 BUILDING D SUBMITTAL -
  
 1. SHEET AA 314 & 322 - PROVIDE LIGHT FRAME TRUSS
 SGNAGE PER FS;
  
 PER FLORIDA 69A-60.0081; NOTICE SIGNAGE IS REQUIRED FOR
 STRUCTURES WITH LIGHT-FRAME TRUSS-TYPE CONSTRUCTION.
 ANY COMMERCIAL, INDUSTRIAL, OR ANY MULTIUNIT
 RESIDENTIAL STRUCTURE OF THREE UNITS OR MORE WHICH USES
 HORIZONTAL OR VERTICAL LIGHT-FRAME TRUSS-TYPE
 CONSTRUCTION IN ANY PORTION SHALL BE MARKED WITH A
 MALTESE CROSS SIGN MEASURING 8 INCHES HORIZONTALLY AND
 8 INCHES VERTICALLY, OF A BRIGHT RED REFLECTIVE COLOR.
 THE APPROVED SYMBOL SHALL BE PLACED WITHIN 24 INCHES TO
 THE LEFT OF THE MAIN ENTRY DOOR.
 A. STRUCTURES WITH LIGHT-FRAME TRUSS ROOFS SHALL BE
 MARKED WITH THE LETTER "R".
 B. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR SYSTEMS
 SHALL BE MARKED WITH THE LETTER "F".
 C. STRUCTURES WITH LIGHT-FRAME TRUSS FLOOR AND ROOF
 SYSTEMS SHALL BE MARKED WITH THE LETTERS "R/F".
  
 2. SHEET ECA 301 & 302 - FIRE ALARM NOTIFICATION
 DEVICES ARE NOT LOCATED WITHIN THE PIT AREA. PROVIDE
 NOTIFICATION DEVICES IN THE PIT AREAS
  
 3. SHEET ECA 201 & 202 - EMERGENCY LIGHTING IS NOT
 PROVICED OR INDICATED INT EH PIT AREA. PROVIDED FOR
 EMERGENCY LIGHTING IN THE PIT AREAS.
  
 4. SHEET FP 303-306 - FIRE SPRINKLER PROTECTION IS NOT
 PROVIDED FOR THE PIT AREAS. FIRE SPRINKLER PROTECTION
 SHALL BE PROVIDED IN ALL AREAS.
  
 5. SHEET AA 301 - PROVIDE INDIOCATION OF FIRE SPRINKLER
 SYSTEM IS PROTECTED AGAINST EXPOSURE TO OUTSIDE WEATHER
 ELEMENTS/CORROSION.
  
 6. SHEET MP 100 - IS THERE A MECHANICAL SHUT OFF FOR
 THE PIT HVAC SYSTEM ? PROVIDE INDICATING NOTE.
  
 7. SHEET MP 100 - IS THERE CO DETECTION WITHIN THE PIT
 ? PROVIDE A INDICATING NOTE.
  
  
  
 BUILDING E SUBMITTAL -
  
 1. PROVIDE A NARRATIVE OR NOTE INDICATING THAT NO FUEL,
 GAS OR DIESEL, SHALL BE STORED IN THIS BUILDING OR ON
 SITE AT ANY TIME.
  
 2. SHEET AA 200 - PROVIDE THE CLASS OF EACH FLAMMABLE
 LIQUID PER NFPA 30.
  
 3. SHEET AA 201 - THE LIFE SAFETY PLAN DOES NOT
 INDICATE ANY SPILL CONTAINMENT EQUIPMENT OR FEATURES.
 PROVIDE CONTAINMENT FOR ALL FLAMMABLE LIQUIED PER NFPA
 30.
  
 4. SHEET AA 204 - THE WALL SECTIONS ON THIS SHEET THAT
 ARE REFERRED TO ON SHEET AA 201 AS FIRE RATED ARE NOT
 INDICATED AS RATED AND DO NOT HAVE A UL LISTING. PLEASE
 CORRECT.
  
 5. SHEET AA 205 - THE DOOR HARDWARE TYPE IS NOT
 INDICATED.
  
  
  
  
 THE BUREAU'S REVIEW OF THIS SUBMITTED PROJECT DOES NOT
 CONSTITUTE IT'S FINAL REVIEW.
  
 THE BUREAU SHALL REVIEW ALL RE-SUBMITTED BUILDING PLANS
 AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH THE
 REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved