2016-03-16 15:10:31 | 1ST REVIEW: FBC 2014 MECHANICAL, EXISTING BUILDING, |
| ENERGY CONSERVATION |
| PERMIT #16020366 |
| 3/16/16 |
| |
| 1) REFER TO SECTION C101.4.4 FBC-14 ENERGY CONSERVATION |
| AND SUBMIT ENERGY CALCULATIONS FOR THE PROPOSED CHANGE |
| OF OCCUPANCY- SEE SECTION C101.5.1 FOR COMPLIANCE |
| MATERIALS, AND C401.2 FOR COMPLIANCE METHODS AND |
| REQUIREMENTS. |
| 2) REFER TO SECTION 1009.1 FBC-14 EXISTING BUILDING AND |
| PROVIDE MINIMUM VENTILATION CALCULATIONS FOR EACH |
| OCCUPIABLE ROOM OR SPACE-IN ACCORDANCE WITH TABLE 404.3 |
| FBC-14 MECHANICAL. PROVIDE A VENTILATION SCHEDULE ON |
| THE PLAN INDICATING THE REQUIRED AND PROVIDED AMOUNT OF |
| OUTDOOR AIR CFM'S. COMPLIANCE FOR NATURAL VENTILATION |
| CAN BE FOUND IN SECTION 402. |
| 3) NO MECHANICAL PLANS HAVE BEEN SUBMITTED FOR THE |
| PROPOSED PROJECT, HOWEVER THE PLANS INDICATE AN |
| AIR-HANDLER ON THE 1ST FLOOR ARCHITECTURAL PLANS. |
| PLEASE PROVIDE COMPLETE AC PLANS AND SPECIFICATIONS |
| INCLUDING: A) AC COOLING AND HEATING CALCULATIONS. B) |
| AN AC DUCT LAYOUT PLAN AND EQUIPMENT SCHEDULE. C) AIR |
| HANDLER AND CONDENSER INSTALLATION DETAILS. D) OUTSIDE |
| AIR DETAILS INCLUDING LOCATION OF THE AIR INTAKE, TYPE |
| AND SIZE OF O/A INTAKE AND CFM CAPACITY. E) CONDENSATE |
| DISPOSAL DETAILS. E) TOILET ROOM EXHAUST VENTILATION |
| PLANS AND DETAILS. |
| 4) THE OPEN AREA HAS BEEN DESIGNATED AS THE EXERCISE |
| AREA WHICH IS CLASSIFIED AS "OCCUPIABLE SPACE" AND |
| THEREFORE MUST BE PROVIDED WITH HEAT AND VENTILATION. |
| PLEASE REFER TO COMMENT #2 ABOVE, AND ALSO SECTION |
| 309.1 FBC-14 MECHANICAL AND SHOW COMPLIANCE. |
| 5) BASED ON THE SCOPE OF WORK FOR THE PROPOSED PROJECT, |
| THE $800.00 JOB VALUE LISTED ON THE PERMIT APPLICATIONS |
| APPEARS EXTREMELY LOW. PLEASE PROVIDE AN ACCURATE VALUE |
| FOR ALL WORK EITHER UNPERMITTED OR PROPSED THAT |
| INCLUDES LABOR, MATERIALS, AND EQUIPMENT FOR ALL PHASES |
| OF CONSTRUCTION INCLUDING BUILDING, MEP, SITE WORK, |
| DESIGN FEES, OVEHEAD AND PROFIT- SEE SECTION 109.3 WPB |
| AMENDMENTS TO THE FBC-10 BUILDING CODE. PLEASE NOTE |
| FURTHER COMMENTS MAY FOLLOW AFTER MORE COMPREHENSIVE |
| PLANS AND SPECIFCATIONS HAVE BEEN SUBMITTED FOR REVIEW. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |