2016-04-11 12:48:50 | 2ND REVIEW: FBC 2014 MECHANICAL |
| PERMIT #16020141 |
| 4/11/16 |
| |
| 1) PLEASE REFER TO NFPA 37-2010 ANNEX EXPLANATORY |
| MATERIAL, SECTIONS A.8.2.3.1 AND A.11.4.2.3, IT APPEARS |
| THAT THE INTENTION IS TO HAVE THE EXHAUST FROM BOTH THE |
| GENERATOR ENGINE AND FROM THE GENERATOR ROOM TERMINATE |
| OUTSIDE OF THE BUILDING AND NOT UNDERNEATH THE |
| STRUCTURE. |
| |
| A.8.2.3.1: EXHAUST SYSTEMS SHOULD NOT TERMINATE UNDER |
| STRUCTURES (INCLUDING LOADING PLATFORMS) OR WHERE |
| EXHAUST GAS ENTRAINMENT INTO VENTILATION INTAKES MIGHT |
| OCCUR. |
| |
| A.11.4.2.3: MECHANICAL VENTILATION SYSTEMS CAN CONSIST |
| OF THE NORMAL VENTILATION SYSTEM FOR THE ROOM OR |
| ENCLOSURE OR A DEDICATED PURGE SYSTEM. EXHAUST AIR |
| SHOULD DISCHARGE OUTSIDE THE STRUCTURE, AWAY FROM |
| OPERABLE WINDOWS AND OUTSIDE AIR INTAKES. IN LOCATING |
| THE EXHAUST AIR DISCHARGE, CONSIDERATION SHOULD BE |
| GIVEN TO BOTH THE ENGINE ENCLOSURE AND NEARBY |
| STRUCTURES. |
| CHAPTER 15, "AIRFLOW AROUND BUILDINGS," OF THE ASHRAE |
| 1997 HANDBOOK-FUNDAMENTALS CAN BE CONSULTED FOR |
| GUIDELINES ONEXHAUST AIR STACK HEIGHT AND DISTANCE FROM |
| OTHER STRUCTURES, AS WELL AS AIR INTAKES NEEDED TO |
| PROVIDE ADEQUATE DILUTION AND TO AVOID DETRIMENTAL |
| EFFECTS OF DOWNDRAFTS. |
| |
| A) REFER TO SECTIONS 501.3 AND 501.3.1(4) FBC-14 |
| MECHANICAL WHICH REQUIRE THE EXHAUST SYSTEMS NOT TO |
| TERMINATE WHERE THEY COULD CAUSE A NUISANCE, OR BE |
| READILY DRAWN INTO A VENTILATING SYSTEM, AND MUST BE 3' |
| FROM EXTERIOR WALLS AND ROOFS. |
| |
| 2) THE SCREENING FOR THE GENERATOR ROOM EXHAUST DUCT |
| SHALL BE CORROSION RESISTANT WITH OPENINGS NOT LESS |
| THAN 1/4" AND NOT LARGER THAN 1/2". THE 1" WELDED |
| STAINLESS MEXH SPECIFIED ON THE PLANS DOES NOT MEET THE |
| CODE. |
| |
| 3) PLEASE PROVIDE WIND LOAD ENGINEERING FOR |
| INSTALLATION OF THE GEF-1 AND EXHAUST DUCTWORK- SECTION |
| 301.15. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |
| |