Plan Review Notes For Permit 16010739 |
Permit Number |
16010739 |
|
Review Stop |
M |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2016-02-05 12:27:49 | 1ST REVIEW: FBC 2014 MECHANICAL | | PERMIT #15080784 | | 2/5/16 | | | | 1) PROVIDE AC LOAD CALCULATIONS FOR THE NEW SPLIT | | SYSTEM AC SYSTEMS- REFER TO SECTION C403.2.1 FBC-14 | | ENERGY CONSERVATION. | | 2) REMOVE RTU-1 FROM THE VENTILATION SCHEDULE AND | | INSERT AC- 4 & 5. ADJUST THE O/A CFM TOTALS BASED ON | | THE TOTAL CFM'S SHOWN IN THE AC EQUIPMENT SCHEDULE. | | 3) PROVIDE A MECHANICAL ROOF PLAN INDICATING THE | | LOCATIONS OF THE NEW CONDENSERS AND REQUIRED WORKING | | CLEARANCES. | | 4) THE ABANDONED RTU MUST BE REMOVED FROM THE ROOF AND | | THE ROOF OPENING MUST BE CAPPED. PROVIDE STRUCTURAL | | DETAILS FOR CAPPING THE OPENING. | | 5) PROVIDE WIND LOAD TIE-DOWN ENGINEERING FOR MOUNTING | | THE CONDENSERS ON EXISTING OR NEW ROOF STANDS. | | 6) PROVIDE CONDENSATE DISPOSAL PLANS FOR THE NEW AIR | | HANDLERS INCLUDING PIPING RUNS, DISCHARGE LOCATIONS, | | AND SECONDARY PROTECTION. | | | | CHRISTOPHER L. COLE | | MECHANICAL PLANS EXAMINER | | 561-805-6719 | | [email protected] | | |
|