Plan Review Notes
Plan Review Notes For Permit 16010623
Permit Number 16010623
Review Stop P
Sequence Number 2
Notes
Date Text
2016-03-17 15:17:072ND REVIEW: FBC 2014
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1. HORIZONTAL DRY VENTS ARE NOT ALLOWED THEY SHALL
 COMPLY WITH FBC PL SEC. 905.3 VENT CONNECTION TO
 DRAINAGE SYSTEM.
 EVERY DRY VENT CONNECTING TO A HORIZONTAL DRAIN SHALL
 CONNECT ABOVE THE CENTERLINE OF THE HORIZONTAL DRAIN
 PIPE.THE VENT BETWEEN TOILET AND LAV IS NOT REQUIRED IT
 MAY BE ELIMINATED TO COMPLY.
 2. SHOW DIMENSION FOR TOILET TO COMPLY WITH FBC PL
 604.2 LOCATION.
 THE WATER CLOSET SHALL BE POSITIONED WITH A WALL OR
 PARTITION TO THE REAR AND TO ONE SIDE. THE CENTERLINE
 OF THE WATER CLOSET SHALL BE 16 INCHES (405 MM) MINIMUM
 TO 18 INCHES (455 MM) MAXIMUM FROM THE SIDE WALL OR
 PARTITION, EXCEPT THAT THE WATER CLOSET SHALL BE 17
 INCHES (430 MM) MINIMUM AND 19 INCHES (485 MM) MAXIMUM
 FROM THE SIDE WALL OR PARTITION IN THE AMBULATORY
 ACCESSIBLE TOILET COMPARTMENT SPECIFIED IN 604.8.2.
 WATER CLOSETS SHALL BE ARRANGED FOR A LEFT-HAND OR
 RIGHT-HAND APPROACH
 3. SHOW CLEAR FLOOR SPACE FOR TOILET TO COMPLY WITH FBC
 PL SEC.604.3.1 SIZE.
 CLEARANCE AROUND A WATER CLOSET SHALL BE 60 INCHES
 (1525 MM) MINIMUM MEASURED PERPENDICULAR FROM THE SIDE
 WALL AND 56 INCHES (1420 MM) MINIMUM MEASURED
 PERPENDICULAR FROM THE REAR WALL
 4. SHOW CLEAR FLOW SPACE FOR LAV TO COMPLY WITH
 FBC PL 606.2 CLEAR FLOOR SPACE.
 A CLEAR FLOOR SPACE COMPLYING WITH 305, POSITIONED FOR
 A FORWARD APPROACH, AND KNEE AND TOE CLEARANCE
 COMPLYING WITH 306 SHALL BE PROVIDED
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved