2016-04-28 09:00:18 | 3RD REVIEW: FBC 2014 MECHANICAL |
| PERMIT #16010466 |
| 4/28/16 |
| |
| 1) SHEET M-1: THE MODEL NUMBERS FOR THE NEW 3-TON BARD |
| UNIT SHOWN ON THE PLAN DO NOT MATCH THE NUMBERS SHOWN |
| ON THE NEW SUBMITTAL- PLEASE CORRECT. |
| 2) M-1: THE AC SCHEDULE INDICATES 2600 CFM'S OF SUPPLY |
| AIR FOR THE 3-TON SYSTEM WHICH WOULLD NOT BE POSSIBLE |
| FOR A 3-TON SYSTYEM. PLEASE NOTE THE NEW BARD SPECS |
| INDICATE THE UNIT WILL PRODUCE 1100 CFRMS. |
| 3) THE SUBMITTED PRODUCT APPROVAL FOR THE LOUVER IS |
| INCOMPLETE: PLEASE PROVIDE A COMPLETE DOCUMENT THAT |
| INCLUDES THE INSTALLATION INSTRUCTIONS AND |
| CERTIFICATION CERTIFICATE AS SHOWN ON PAGE-3 OF THE |
| SUBMITTAL. |
| 4) PROVIDE AN NOA OR FLORIDA PRODUCT APPROVAL FOR THE |
| GREENHECK FAN EXTERIOR WEATHERHEAD. |
| 5) ADVISORY: AS REQUESTED BY THE CONTRACTOR, THE WIND |
| LOAD ENGINEERING FOR INSTALLATION OF THE BARD UNIT CAN |
| BE DONE AS A DEFERRED SUBMITTAL. PLEASE REVIEW SECTION |
| 107.3.4.2 WPB AMENDMENTS TO THE FLORIDA BUILDING |
| CODE:1) DEFERRED SUBMITTAL: FOR THE PURPOSES OF THIS |
| SECTION, DEFERRED SUBMITTALS ARE DEFINED AS THOSE |
| PORTIONS OF THE DESIGN THAT ARE NOT SUBMITTED AT THE |
| TIME OF THE APPLICATION AND THAT ARE TO BE SUBMITTED TO |
| THE BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. |
| DEFERRAL OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR |
| APPROVAL OF THE BUILDING OFFICIAL. THE REGISTERED |
| DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST |
| THE DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS |
| FOR REVIEW BY THE BUILDING OFFICIAL. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |