Date |
Text |
2016-02-10 16:50:13 | 1ST ELECTRICAL REVIEW NOTES: |
| REVIEWED FOR COMPLIANCE WITH: |
| FBC 2010, NEC 2008 |
| |
| CORRECTIONS REQUIRED: (ITEMS MARKED IN GREEN ARE ONLY |
| ENERGY CONSERVATION AND CONVENIENCE SUGGESTIONS) UNIT |
| DL WAS REVIEWED FIRST, BUT COMMENTS MARKED TYPICAL |
| APPLY TO ENTIRE PROJECT AND MAY BE REMEDIED WITH A |
| NOTE. |
| SHEET E0.1 |
| 1. CORRECT MISQUOTED FBC SECTIONS AS FOLLOWS: NOTE P: |
| FBC-EC405.7.3.2 & NOTE Q: FBC-EC405.7.3.1 |
| SHEET 2.1 |
| 2. FBC-B1011.1 ADDITIONAL EXIT SIGN REQUIRED WITHIN |
| THIS AREA AS THERE CAN BE NO MORE THAN 100? BETWEEN |
| EXIT SIGNS. |
| 3. FBC-E C405.5. INTERIOR LIGHTING POWER REQUIREMENTS. |
| A BUILDING COMPLIES WITH THIS SECTION IF ITS TOTAL |
| CONNECTED LIGHTING POWER CALCULATED UNDER SECTION |
| C405.5.1 IS NO GREATER THAN THE INTERIOR LIGHTING POWER |
| CALCULATED UNDER SECTION C405.5.2. PROVIDE A LIGHTING |
| POWER DENSITY CHART TO SHOW COMPLIANCE. |
| 4. FBC-EC405.5.2 INTERIOR LIGHTING POWER ALLOWANCE. THE |
| TOTAL INTERIOR POWER ALLOWANCE IS DETERMINED ACCORDING |
| TO THE APPLICABLE TABLES AS INDICATED IN THIS SECTION. |
| SHEET E3.1 |
| 5. NEC 110.16 ARC-FLASH HAZARD WARNING: ELECTRICAL |
| EQUIPMENT IN OTHER THAN DWELLING UNITS LIKELY TO |
| REQUIRE SERVICED WHILE ENERGIZED SHALL BE FIELD MARKED |
| TO WARN AGAINST POTENTIAL ARC-FAULT HAZARDS. |
| |
| WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR |
| RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER |
| (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER |
| WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD |
| CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID |
| AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR |
| COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE |
| GREATLY APPRECIATED. |
| |
| IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO |
| CONTACT ME DIRECTLY. |
| |
| THANK YOU, |
| MIKE ALBARRAN |
| ELECTRICAL PLANS EXAMINER |
| PH: 561-805-6746 |
| EMAIL: [email protected] |
| |