Date |
Text |
2016-02-20 21:10:32 | 1. CONTRACTORS, SUBCONTRACTORS AND PERSONS HOLDING |
| PERMITS TO PERFORM LAND DISTURBING CONSTRUCTION OR |
| LAND DEVELOPMENT ACTIVITIES, AND THE LANDOWNERS OF |
| CONSTRUCTION SITES SHALL CAUSE THE CONSTRUCTION |
| SITE TO BE MAINTAINED IN A NEAT AND ORDERLY CONDITION |
| THAT IS FREE FROM ANY DEBRIS, GARBAGE, JUNK, |
| USED OR DISCARDED CONSTRUCTION MATERIALS, TRASH OR ANY |
| OTHER FOREIGN SUBSTANCE PRODUCED AS A RESULT |
| OF THE LAND DISTURBING CONSTRUCTION OR LAND DEVELOPMENT |
| ACTIVITIES, OTHER THAN DEBRIS, GARBAGE, JUNK, |
| TRASH OR OTHER FOREIGN SUBSTANCE DEPOSITED INTO AND |
| CONTAINED WITHIN A TRASH RECEPTACLE OR TRASH |
| DUMPSTER. |
| 2. IN ALL INSTANCES WHERE A BUILDING PERMIT HAS NOT |
| BEEN ISSUED WITHIN THREE MONTHS OF THE COMPLETION |
| OR ABANDONMENT OF LAND DISTURBING CONSTRUCTION |
| ACTIVITIES, THE JOB SITE SHALL, WITHIN 30 DAYS AFTER |
| THE |
| EXPIRATION OF SUCH THREE?MONTH PERIOD, BE BROUGHT TO |
| GRADE, TILLED, PLANTED AND MAINTAINED WITH |
| GROUND COVER TO INCLUDE SODDING OR SEEDING WHICH SHALL |
| HAVE IRRIGATION. ANY TEMPORARY CONSTRUCTION |
| FENCE SHALL ALSO BE REMOVED. THE CONSTRUCTION SERVICES |
| DIRECTOR OR DESIGNEE, WITH INPUT FROM THE |
| PLANNING DIRECTOR OR DESIGNEE, MAY GRANT, IN WRITING, |
| AN EXTENSION TO THE TIME FRAME FOR THE ISSUANCE |
| OF A BUILDING PERMIT, UNDER THIS PARAGRAPH, WHEN THE |
| LANDOWNER HAS DEMONSTRATED A GOOD FAITH |
| EFFORT IN PURSUING THE BUILDING PERMIT BUT THAT |
| CIRCUMSTANCES BEYOND THE CONTROL OF THE CONTRACTOR |
| AND/OR PERMITTEE HAVE OCCURRED. |
| 3. ALL CONSTRUCTION WASTE AND DEBRIS FROM NEW |
| CONSTRUCTION OR MAJOR ALTERATION OR REPAIR SHALL BE |
| KEPT |
| IN AN ENCLOSED CONTAINER TO MINIMIZE DEBRIS FROM |
| LITTERING ADJACENT PROPERTIES AND PUBLIC RIGHTS?OFWAY. |
| THE PERMITTEE, CONTRACTOR OR LANDOWNER SHALL CAUSE SUCH |
| WASTE OR DEBRIS TO BE REMOVED WEEKLY |
| IN ACCORDANCE WITH SECTION 74?2 OF THE CITY OF WEST |
| PALM BEACH CODE OF ORDINANCES. |
| 4. ALL MUD OR DEBRIS SHALL BE CONTINUALLY REMOVED FROM |
| THE PUBLIC SIDEWALKS AND STREETS. |
| 5. CONTRACTORS, SUBCONTRACTORS, PERSONS HOLDING PERMITS |
| TO PERFORM LAND DISTURBING CONSTRUCTION AND |
| LAND DEVELOPMENT ACTIVITIES AND THE LANDOWNERS OF |
| CONSTRUCTION SITES SHALL, AT THE DIRECTION OF THE |
| ENGINEERING SERVICES DIRECTOR OR DESIGNEE, EITHER |
| REPAIR, OR REIMBURSE THE CITY FOR ITS COSTS INCURRED TO |
| REPAIR, ANY DAMAGE TO ANY PUBLIC RIGHT?OF?WAY THAT IS |
| CAUSED BY ANY CONSTRUCTION VEHICLE INVOLVED IN |
| THE LAND DISTURBING CONSTRUCTION OR LAND DEVELOPMENT |
| ACTIVITIES. |
| 6. IN THE EVENT THAT THE DEMOLITION PERMIT OR BUILDING |
| PERMIT EXPIRES, ALL MATERIALS AND EQUIPMENT |
| RELATED TO THE LAND DISTURBING CONSTRUCTION OR LAND |
| DEVELOPMENT ACTIVITIES SHALL BE REMOVED FROM THE |
| JOB SITE WITHIN TEN DAYS OF THE PERMIT EXPIRATION DATE. |
| THE JOB SITE SHALL, WITHIN 30 DAYS THEREAFTER, |
| BE BROUGHT TO GRADE, BE TILLED AND PLANTED WITH GROUND |
| COVER TO INCLUDE SODDING OR SEEDING WHICH |
| SHALL HAVE IRRIGATION. SAID GROUND COVER SHALL BE |
| MAINTAINED IN ACCORDANCE WITH SUBSECTIONS 74?2(C) |
| AND SECTION 94?446 OF THIS CODE. |
| 7. DEMOLITION CONTRACTOR WILL BE RESPONSIBLE FOR |
| DEVELOPING AND IMPLEMENTING A SITE SPECIFIC |
| STORMWATER POLLUTION PREVENTION PLAN (SWPPP). |
| |
| STORMWATER POLLUTION PREVENTION PLAN |
| MINIMUM REQUIREMENTS FOR DEMOLITION PROJECTS |
| THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR |
| INSTALLATION OF APPROPRIATE EROSION AND SEDIMENT |
| CONTROL |
| MEASURES. |
| EXISTING UTILITIES (WATER, SANITARY, STORMWATER, GAS, |
| ELECTRIC, ETC.) WILL BE CAPPED OR REMOVED PRIOR TO |
| THE START OF ANY OTHER DEMOLITION ACTIVITIES. |
| PRIOR TO THE START OF ANY DEMOLITION ACTIVITIES, A |
| DOUBLE ROW OF SILT FENCING WILL BE INSTALLED AT THE |
| BETWEEN THE SITE AND ANY ADJACENT BODIES OF WATER. |
| WHERE POSSIBLE, A SINGLE ROW OF SILT FENCE WILL BE |
| INSTALLED AROUND THE PERIMETER OF THE REMAINDER OF THE |
| CONSTRUCTION AREA. ADJACENT STORMWATER |
| CATCH BASINS AND INLETS WILL BE PROTECTED BY COVERING |
| WITH SILT FENCE MATERIAL OR |
| DUST CONTROL MEASURES WILL BE IMPLEMENTED BY DEMOLITION |
| CONTRACTOR AS NEEDED TO SUPPRESS DUST |
| LEVELS TO BELOW THOSE LISTED IN 29 CFR 1926.55. |
| ALL WASTE/DEBRIS LEAVING THE SITE WILL BE IN CLOSED OR |
| COVERED CONTAINERS. |