2016-08-17 08:55:58NEW SINGLE FAMILY RESIDENCE (R3) FOURTH BUILDING REVIEW
 CHECKLIST.
 CODE: FBC 5TH EDITION (2014).
  
 ***NOTE:
 BUILDING REVIEW MAY BE APPROVED WITH PROVISO ONCE THE
 ENERGY CALCULATIONS ARE CERTIFIED BY THE OWNER. PROVISO
 MEANS THAT PERMIT MAY BE ISSUED AFTER THE IMPACT FEES
 AND RECEIPT ARE SUBMITTED. THE REQUIRED INFORMATION MAY
 BE SUBMITTED AFTER THE PERMIT IS ISSUED. REVISION FEES
 MAY APPLY EXCEPT FOR THE ENTRY DOOR PRODUCT APPROVAL.
 REQUIRED INFORMATION TO BE SUBMITTED PRIOR TO
 INSPECTIONS TO AVOID CONFLICTS OR DELAYS. CONTRACTOR TO
 ADVICE IN WRITING IF PROVISO OPTION IS PREFERRED AT
 THIS TIME.
  
  
  
 ORIGINAL COMMENT:
 1-ENERGY CALCULATIONS SUBMITTED:
 ORIGINAL COMMENT:
 A) BUILDER TO COMPLETE THE ENERGY PERFORMANCE LEVEL
 (EPL) DISPLAY CARD. SEC. R405.3 OF FBC-ENERGY
 CONSERVATION, 5TH EDITION (2014).
  
 RESPONSE:
 REPEAT COMMENT. FOUR TIMES.
  
 ORIGINAL COMMENT:
 B) THE OWNER OR OWNER'S AUTHORIZED AGENT NEEDS TO
 CERTIFY AND DATE THE ENERGY CALCULATIONS AT THE BOTTOM
 OF FORM AS REQUIRED BY SEC. R103.1.1.2 FBC- ENERGY
 CONSERVATION. ENERGY CALCULATIONS SUBMITTED SHOW THE
 NAME OF THE OWNER ONLY. THIS IS NOT CERTIFICATION THAT
 THE OWNER IS COMPLYING WITH THE ENERGY CODE. HE/SHE MAY
 NOT EVEN BE AWARE OF THIS CERTIFICATION. NEED THE OWNER
 OR AGENT TO SPECIFICALLY CERTIFY COMPLIANCE.
  
 RESPONSE:
 REPEAT COMMENT. TWO TIMES. WRITING DOWN THE NAME OF THE
 OWNER IS NOT PROOF THAT THE OWNER IS CERTIFYING
 COMPLIANCE. PERMIT CAN NOT BE ISSUED WITHOUT THE
 OWNER'S CERTIFICATION. SEC. R103.1.1.2 FBC-ENERGY
 CONSERVATION.
  
 NEW COMMENT:
 C) CONDITIONED FLOOR AREA SHOWN ON ITEM #6 WAS REVISED.
 NOW, IT DOESN'T MATCH FLOOR PLANS. REVISE AS REQUIRED.
 (NOTE: REVISE THE AREAS SHOWN ON ITEM #8 ACCORDINGLY).
 SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 NEW COMMENT:
 D) ROOF MATERIAL SHOWN ON PAGE 2 OF 5 WAS REVISED. NOW
 IT DOESN'T MATCH MATERIAL SPECIFIED ON PLANS. REVISE AS
 REQUIRED. SEC. R101.5.1.1.2 FBC-ENERGY CONSERVATION.
  
 NEW COMMENT:
 E) THERE ARE TWO NEW INSULATED DOORS SHOWN ON PAGE 3 OF
 5. THERE ARE NOT INSULATED DOORS SPECIFIED ON PLANS OR
 PRODUCT APPROVALS SUBMITTED. WHERE ARE THESE DOORS.
 REVISE AS REQUIRED TO MATCH PLANS. SEC. R101.5.1.1.2
 FBC-ENERGY CONSERVATION.
  
 NOTE: LABEL FOR WINDOWS AND DOORS SHOWING THE U-FACTOR
 AND SHGC FACTOR SPECIFIED ON THE ENERGY CALCULATIONS
 WILL BE REQUIRED WHEN THE ENERGY CALCULATIONS ARE NOT
 USING THE SOFTWARE DEFAULT FACTOR FOR GLAZING.
  
  
 ORIGINAL COMMENT:
 2- ENERGY CALCULATIONS ARE TAKING THE CEILING FAN AND
 CROSS VENTILATION CREDITS ON ITEM #15 OF PAGE 1 OF 5.
 DESIGNER OF RECORD TO PROVIDE COMPLETE DETAILS AND
 SPECIFICATIONS ON THE CONSTRUCTION DRAWINGS SHOWING
 FULL COMPLIANCE WITH SEC. R405.7.6 AND SEC. R405.7.4 OF
 FBC-ENERGY CONSERVATION, 5TH EDITION (2014).
  
 RESPONSE:
 REPEAT COMMENT. ENERGY CALCULATIONS ARE STILL TAKING
 THE CEILING FAN CREDIT. DESIGNER OF RECORD NEEDS TO
 SHOW IN PLANS COMPLIANCE WITH THE CEILING FAN
 REQUIREMENTS. PROVIDE ALL THE INFORMATION REQUIRED BY
 SEC. R405.7.6 FBC-ENERGY CONSERVATION.
  
 3- AFTER PLANS ARE REVISED, BRING THEM TO PALM BEACH
 COUNTY (2300 N. JOG RD.) FOR IMPACT FEES ASSESSMENT.
 BRING BACK COUNTY STAMPED PLANS AND COPY OF PAID
 RECEIPT IF FEES ARE DUE. COUNTY IMPACT FEE ORDINANCE OF
 THE UNIFIED LAND DEVELOPMENT CODE.
  
 ***PLEASE PROVIDE RESPONSE LETTER ADDRESSING EACH
 COMMENT TO EXPEDITE THE REVIEW PROCESS.
 ***PLEASE REMOVE AND REPLACE ANY REVISED DRAWING. DON'T
 STAPLE OLD COPY TO THE PLANS. SUBMIT OLD COPIES FOR
 REFERENCE.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved