Plan Review Notes
Plan Review Notes For Permit 16010199
Permit Number 16010199
Review Stop P
Sequence Number 1
Notes
Date Text
2016-01-16 08:05:521ST REVIEW: FBC 2014
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1. PROVIDE A HOT WATER RECIRC SYSTEM TO COMPLY WITH.
 FBC PL SEC 607.2 HOT OR TEMPERED WATER SUPPLY TO
 FIXTURES.
 THE DEVELOPED LENGTH OF HOT OR TEMPERED WATER PIPING,
 FROM THE SOURCE OF HOT WATER TO THE FIXTURES THAT
 REQUIRE HOT OR TEMPERED WATER, SHALL NOT EXCEED 50 FEET
 (15 240 MM). RECIRCULATING SYSTEM PIPING AND
 HEAT-TRACED PIPING SHALL BE CONSIDERED TO BE SOURCES OF
 HOT OR TEMPERED WATER
 2.WATER HEATER NOTE SHOWS WH BEING SET AT 140 PROVIDE
 TEMPERATURE LIMITING DEVICE THAT CONFORMS TO ASSE 1070
 SET AT 120 TO HAND WASHING SINKS AND 110 FOR PUBLIC
 RESTROOMS. PER FBC ENERGY. C404.3 TEMPERATURE CONTROLS.
 SERVICE WATER-HEATING EQUIPMENT SHALL BE PROVIDED WITH
 CONTROLS TO ALLOW A SETPOINT OF 110F (43C) FOR
 EQUIPMENT SERVING DWELLING UNITS AND 90F (32C) FOR
 EQUIPMENT SERVING OTHER OCCUPANCIES. THE OUTLET
 TEMPERATURE OF LAVATORIES IN PUBLIC FACILITY REST ROOMS
 SHALL BE LIMITED TO 110F (43C).
 3. WHAT TEMPERATURE WILL THE WATER BE DRAINING FROM THE
 HOT WELL #19 ON KIT SCHEDULE IT SHALL COMPLY WITH FBC
 PL. SEC 701.7 WASTE WATER WHERE DISCHARGED INTO THE
 BUILDING DRAINAGE SYSTEM SHALL BE AT A TEMPERATURE NOT
 GREATER THAN 140?
 4. SHEET INDEX INDICATES DEMO PLAN BUT IT IS NOT IN
 PLAN SET PLEASE PROVIDE. PER WPB AMEND. TO FBC SEC.
 107.2.1
 5. PROVIDE MANUFACTURE SPECS ON SUB WATER MATER.PER WPB
 AMEND. TO FBC SEC. 107.2.1
 6. LIST MANUFACTURE AND MODEL OF BACKFLOW DEVICES. PER
 WPB AMEND. TO FBC SEC. 107.2.1
 7. ADDRESS ON PLANS IS WRONG PLEASE CORRECT. PER WPB
 AMEND. TO FBC SEC. 107.2.1
 8. AAV ARE NOT ALLOWED ON THE FIRST FLOOR OF THIS
 BUILDING. PER FBC PL. SEC
 918.3.1 HORIZONTAL BRANCHES.
 INDIVIDUAL AND BRANCH-TYPE AIR ADMITTANCE VALVES SHALL
 VENT ONLY FIXTURES THAT ARE ON THE SAME FLOOR LEVEL AND
 CONNECT TO A HORIZONTAL BRANCH DRAIN. WHERE THE
 HORIZONTAL BRANCH IS LOCATED MORE THAN FOUR BRANCH
 INTERVALS FROM THE TOP OF THE STACK, THE HORIZONTAL
 BRANCH SHALL BE PROVIDED WITH A RELIEF VENT THAT SHALL
 CONNECT TO A VENT STACK OR STACK VENT, OR EXTEND
 OUTDOORS TO THE OPEN AIR. THE RELIEF VENT SHALL CONNECT
 TO THE HORIZONTAL BRANCH DRAIN BETWEEN THE STACK AND
 THE MOST DOWNSTREAM FIXTURE DRAIN CONNECTED TO THE
 HORIZONTAL BRANCH DRAIN. THE RELIEF VENT SHALL BE SIZED
 IN ACCORDANCE WITH SECTION 906.2 AND INSTALLED IN
 ACCORDANCE WITH SECTION 905. THE RELIEF VENT SHALL BE
 PERMITTED TO SERVE AS THE VENT FOR OTHER FIXTURES.