Plan Review Notes For Permit 15120919 |
Permit Number |
15120919 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2016-01-09 06:09:45 | 1) CLEARLY SHOW ON THE RISER HOW THE SHOWER IN THE | | MASTER BATH IS CONNECTED TO THE BELOW SLAB BUILDING | | DRAIN. THE RISER IS UNCLEAR, PIPING IS NOT CLEARLY | | SHOWN . WPB AMEND. TO FBC SEC. 107.2.1. | | 2) THE VENT FOR THE WATER CLOSET IN THE MASTER BATH | | APPEARS TO BE DRAWN AS A FLAT, DRY VENT. THE BASE OF | | THE VENT MUST BE WASHED BY A FIXTURE. THE VENT SHALL | | CONNECT TO THE HORIZONTAL DRAIN ABOVE THE CENTERLINE OF | | THE HORIZONTAL DRAIN PIPE PER 2014 FBCR SEC.P3104.3. | | THE SEPARATE VENT FOR THE WATER CLOSET IS NOT REQUIRED, | | IT IS VENTED BY THE STACK FOR THE LAVATORY. | | 3) PLEASE CLARIFY HOW THE TUB AND WATER CLOSET ARE | | VENTED IN BATH #2. THE VENT FOR THE TUB ALSO APPEARS TO | | BE A FLAT, DRY VENT. CLARIFY. | | 4) SHT. L1.0 SHOWS THAT DROUGHT TOLERANT PLANTS & SOD | | WILL BE INSTALLED. DOES THIS MEAN THAT THERE WILL NOT | | BE AN IRRIGATION SYSTEM INSTALLED ON THIS STRUCTURE? | | CLARIFY. IF AN IRRIGATION SYSTEM WILL BE INSTALLED, | | THEN AN APPROVED BACCKFLOW PREVENTER, CONTROLLER, AND | | RAIN SENOSR WILL BE REQUIRED ON THE SYSTEM. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | |
|