Plan Review Notes For Permit 15120740 |
Permit Number |
15120740 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2015-12-29 06:04:25 | 1) THE PLANS INDICATE THAT THE EXISTING GAS WATER | | HEATER IS BEING RELOCATED. SUBMIT A GAS AND WATER | | PIPING RISER DIAGRAM FOR THE CHANGES TO THE GAS AND | | WATER SYSTEMS. WPB AMEND. TO FBC SEC. 107.3.5.1.3. | | 2) THE GATE VALVE SHALL BE LOCATED ON THE DISCHARGE | | SIDE OF THE CHECK VALVE. 2014 FBC-PLUMBING SEC. 712.2. | | 3) THE GATE AND CHECK VALVES SHALL BE | | ACCESSIBLE.INDICATE ON THE PLANS HOW THIS WILL BE | | ACCOMPLISHED.2014 FBC-PLUMBING SEC.712.2. | | 4) SUBMIT A FLOOR PLAN SHOWING THE LOCATION OF THE LIFT | | STATION. WPB AMEND. TO FBC SEC. 107.2.1. | | 5) THE CONNECTION OF THE DISCHARGE LINE TO THE BUILDING | | DRAINAGE SYSTEM SHALL BE THROUGH A WYE FITTING INTO THE | | TOP OF THE DRAINAGE PIPING IN ACCORDANCE WITH 2014 | | FBC-PLUMBING SEC.712.3.5. | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | | | |
|