2016-03-31 08:00:00 | 2ND ELECTRICAL PLAN REVIEW |
| |
| APPLICABLE CODES IN EFFECT: |
| FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH |
| EDITION |
| NFPA 70- 2011 NEC |
| PENDING COMMENTS: |
| |
| THE BELOW COMMENTS AS PREVIUOSLY STATED WILL REQUIRE |
| AHJ APPROVAL, PLEASE MAKE ARRANGEMENTS TO CONTACT |
| ROBERT BROWN (BO) OR DOUG HARVEY (ABO) |
| ALL OTHER COMMENTS ADDRESSED EXCEPT THE BELOW INITIAL |
| REVIEW COMMENTS |
| |
| |
| 13. SHEET 3.1- PLEASE NOTE THAT ALL MAIN DISCONNECTS |
| MUST BE GROUPED AT THE SAME LOCATION PER NEC 230.72A. |
| ALSO NEC 230.2 REQUIRES THAT BUILDINGS BE SUPPLIED BY |
| ONLY ONE SERVICE UNLESS PERMITTED BY NEC 230.2A THROUGH |
| 230.2D. THE ARRANGEMENTS OF THE ELECTRICAL SERVICE |
| SHOWN PER PHASING INTENT MUST BE APPROVED BY SPECIAL |
| PERMISSION OF THE AHJ. PROVIDE REQUEST IN WRITING WHICH |
| IS SUBJECT TO APPROVAL. |
| 14. SHEET 3.2- RISER DIAGRAM AT THIS TIME WILL NEED TO |
| BE REVISITED PENDING APPROVAL AS NOTED IN COMMENT #13. |
| SEE ABOVE. |
| 15. SHEETS 4.1 THROUGH 4.4- PANEL SCHEDULES AT THIS |
| TIME WILL NEED TO BE REVISITED PENDING APPROVAL AS |
| NOTED IN COMMENT #13. SEE ABOVE. |
| 16. SHEET 5.3- ELECTRICAL ROOMS MUST COMPLY WITH NEC |
| 110.26C2, THERE SHALL BE ONE ENTRANCE AT EACH END OF |
| THE WORKING SPACE. SHOW TWO MEANS OF EXIT FOR ROOM 170. |
| ALSO NEC 110.26C3 REQUIRES PERSONNEL DOORS TO BE |
| EQUIPPED WITH PANIC HARDWARE AND OPEN IN THE DIRECTION |
| OF EGRESS. A NOTE WILL SUFFICE. |
| |
| |
| VALENTINO PEREZ |
| ELECTRICAL PLANS EXAMINER II |
| 561-805-6717 |
| [email protected] |