2016-02-12 15:50:45 | 2ND REVIEW: FBC 2014 MECHANICAL |
| PERMIT #15120534 |
| 2/12/16 |
| |
| 1) AS STATED IN THE LETTER FROM MR. HUMBERTO DIAZ |
| R403.6.1 EQUIPMENT SIZING. |
| "HEATING AND COOLING EQUIPMENT SHALL BE SIZED IN |
| ACCORDANCE WITH ACCA MANUAL S BASED ON THE EQUIPMENT |
| LOADS CALCULATED IN ACCORDANCE WITH ACCA MANUAL J OR |
| OTHER APPROVED HEATING AND COOLING CALCULATION |
| METHODOLOGIES, BASED ON BUILDING LOADS FOR THE |
| DIRECTIONAL ORIENTATION OF THE BUILDING. THE |
| MANUFACTURER AND MODEL NUMBER OF THE OUTDOOR AND INDOOR |
| UNITS (IF SPLIT SYSTEM) SHALL BE SUBMITTED ALONG WITH |
| THE SENSIBLE AND TOTAL COOLING CAPACITIES AT THE DESIGN |
| CONDITIONS DESCRIBED IN SECTION R302.1. THIS CODE DOES |
| NOT ALLOW DESIGNER SAFETY FACTORS, PROVISIONS FOR |
| FUTURE EXPANSION OR OTHER FACTORS WHICH AFFECT |
| EQUIPMENT SIZING. SYSTEM SIZING CALCULATIONS SHALL NOT |
| INCLUDE LOADS CREATED BY LOCAL INTERMITTENT MECHANICAL |
| VENTILATION SUCH AS STANDARD KITCHEN AND BATHROOM |
| EXHAUST SYSTEMS." THE SUBMITTED REVISED CALCULATION |
| DOES NOT PROVIDE LOADS BASED ON THE DIRECTIONAL |
| ORIENTATION OF THE BUILDING, DOES NOT IDENTIFY THE |
| PROJECT, PROJECT ADDRESS,MANUFACTURER AND MODEL NUMBER |
| OF THE EQUIPMENT, AND THE PERSON WHO PREPARED THE |
| CALDCULATION. THE LETTER STATES THAT THE CALCULATION |
| METHOD USED IS THE CARRIER HAP SOFTWARE PROGRAM HOWEVER |
| THAT TITLE DOES NOT APPEAR ANYWHERE ON THE DOCUMENT. AS |
| PREVIOULSY REQUESTED, PLEASE PROVIDE MANUAL J |
| CALCULATIONS USING AN APPROVED SOFTWARE PROGRAM. |
| 2) THE AC CLOSET SIZE IS NOT IN COMPLIANCE WITH SECTION |
| M1305.1.1 WHICH REQUIRES THE ENCLOSING SPACE TO BE AT |
| LEAST 12 IN. WIDER THAN THE WIDTH OF THE AIR HANDLER. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |