Plan Review Notes
Plan Review Notes For Permit 15120234
Permit Number 15120234
Review Stop P
Sequence Number 1
Notes
Date Text
2015-12-09 06:07:441) THE OIL SEPARATOR DOES NOT CCOMPLY WITH THE 2014
 FBC-PLUMBING, SECS. 1003.4.1, 1003.4.2.1., 1003.4.2.2.
 - THE OIL SEPARATOR SHALL HAVE A DEPTH OF NOT LESS THAN
 2 FT. BELOW THE INVERT OF THE DISCHARGE DRAIN.THE
 OUTLET OPENING OF THE SEPARATOR SHALL HAVE NOT LESS
 THAN AN 18 INCH WATER SEAL.
 2) THE OIL SEPARATORR SHALL HAVE A CAPACITY OF NOT LESS
 THAN 6 CUBIC FEET FOR THE FIRST 100 SQUARE FEET OF AREA
 TO BE DRAINED, PLUS 1 CUBIC FOOT FOR EACH ADDITIONAL
 100 SQUARE FEET OF AREA TO BE DRAINED INTO THE
 SEPARATOR.
 3) SUBMIT THE TOTAL SQUARE FOOT AREA THAT IS GOING TO
 BE DRAINED BY THE TRENCH DRAIN. WPB AMEND. TO FBC SEC.
 107.2.1.
 4) SUBMIT FACTORY SIZING CALCULATIONS FOR THE OIL
 SEPARATOR DONE BY SCHIER. CONTACT LEE SCHNEEWEISS AT
 1-800- 538-4792.
 5) THE DETAIL OF THE OS-25 WITH RISER SHOWS A 3 INCH
 PIPE SIZE BUT THE SPECIFICATIONS LISTED AT THE BOTTOM
 OF THE PAGE NOTES A 4 INCH INLET & OUTLET. CLARIFY.
 6) A SAMPLING PORT IS REQUIRED ON THE OUTLET OF THE
 SEPARATOR. WPB AMEND. TO FBC SEC. 107.2.1. I WOULD
 SUGGEST SPEAKING TO THE SCHIER REPRESENTATIVE REGARDING
 THIS ITEM.
 7) SHOW THE REQUIRED CELANOUTS ON THE INTERCEPTOR. WPB
 AMEND. TO FBC SEC. 107.2.1.
 8) SHOW THE SIZE OF THE PIPE ENTERING AND LEAVING THE
 INTERCEPTOR ON THE PLAN VIEW DRAWING.
 9) SUBMIT 2 COPIES OF INSTALLATION MANUAL FROM SCHIER
 FOR THE PROPERLY SIZED UNIT. WPB AMEND. TO FBC SEC.
 107.2.1.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved