Plan Review Notes For Permit 15111015 |
Permit Number |
15111015 |
|
Review Stop |
ENG |
Sequence Number |
2 |
|
Notes |
Date |
Text |
2015-12-23 13:26:02 | SPOKE WITH ROBERT BROWN, BUILDING OFFICIAL, AND KELLY | | CRANFORD, ENGINEERING PLAN REVIEWER, AND BASED ON THE | | CONVERSATIONS AND NOTES, A "NOT REQUIRED" RESULT IS | | ADDED TO THE ENGINEERING STOP AT THIS TIME. THIS WILL | | BE CONSIDERED PHASE 1 OF THE PROCESS AND INCLUDE ONLY | | THE SUPERINTENDENTS TRAILER AND INSTALLATION OF SAME. | | NO ELECTRIC OR WATER IS BEING CONSIDERED AT THIS TIME. | | SEPARATE PERMITS FOR ELECTRIC AND WATER, WITH COMPLIANT | | DRAWINGS ARE REQUIRED FOR THOSE PORTIONS OF THE WORK | | AND WILL BE SUBMITTED IN THE ANTICIPATED NEAR FUTURE. |
|