Text |
2015-11-24 11:59:16 | 1ST REVIEW 2014 MECHANICAL |
| PERMIT #15110808 |
| 11/24/15 |
| |
| 1) IN REFERENCE TO THE VEHICLE DELIVERY GARAGE PLEASE |
| SEE SECTION 404.1 ENCLOSED PARKING GARAGES. |
| MECHANICAL VENTILATION SYSTEMS FOR ENCLOSED PARKING |
| GARAGES SHALL BE PERMITTED TO OPERATE INTERMITTENTLY IN |
| ACCORDANCE WITH ITEM 1, ITEM 2 OR BOTH. |
| 1. THE SYSTEM SHALL BE ARRANGED TO OPERATE |
| AUTOMATICALLY UPON DETECTION OF VEHICLE OPERATION OR |
| THE PRESENCE OF OCCUPANTS BY APPROVED AUTOMATIC |
| DETECTION DEVICES. |
| 2. THE SYSTEM SHALL BE ARRANGED TO OPERATE |
| AUTOMATICALLY BY MEANS OF CARBON MONOXIDE DETECTORS |
| APPLIED IN CONJUNCTION WITH NITROGEN DIOXIDE DETECTORS. |
| SUCH DETECTORS SHALL BE INSTALLED IN ACCORDANCE WITH |
| THEIR MANUFACTURER'S RECOMMENDATIONS. |
| A) SHEET M1.1: BASED ON THE CODE SECTION ABOVE, |
| NITROGEN DIOXIDE DETECTORS SHALL BE INSTALLED ALONG |
| WITH THE CO DETECTORS. REVISE THE PLANS ACCORDINGLY AND |
| SUBMIT CUT SHEETS FOR THE DETECTORS REVIEWED AND |
| APPROVED BY THE DESIGN PROFESSIONAL OF RECORD. |
| B) EXHAUST VENTILATION AT A RATE OF .75 CFM/SF. SHALL |
| BE INSTALLED IN THE VEHICLE DELIVERY GARAGE- TABLE |
| 403.3. REVISE THE PLANS TO SHOW THE LCATIONS OF THE |
| EXHAUST FAN(S) AND PROVIDE A SEQUENCE OF OPERATION. |
| PROVIDE AN EQUIPMENT SCHEDULE FOR THE FANS AND SUBMIT |
| PRODUCT SPECS. |
| C) PROVIDE AN EQUIPMENT SCHEDULE ON THE PLAN FOR THE |
| NEW EXHAUST FAN(S) AT THE SERVICE/RECEPTION AREAS, AND |
| SUBMIT MANUFACTUTERS'S CUT SHEETS AND MIAMI DADE NOA'S |
| REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL OF |
| RECORD. |
| 3) SHEET M0.1 & M1.1: DUCT SMOKE DETECTORS ARE LISTED |
| AS NOT REQUIRED IN THE SCHEDULE, HOWEVER, IN ACCORDANCE |
| WITH SECTION 606.2.1 DETECTORS ARE REQUIRED TO BE |
| PLACED IN THE RETURN AIR PLENUMS OF RTU'S 1, 3, 6, & 9. |
| PLEASE PROVIDE AN INSTALLATION DETAIL AND EQUIPMENT |
| SCHEDULE ON THE PLAN, AND SUBMIT MANUFACTURER 'S |
| SPECIFICATIONS REVIEW AND APPROVED BY THE DESIGN |
| PROFESSIONAL OF RECORD, |
| 4) M0.1 THE DESIGN CRITERIA FOR THE AC SYSTEM LISTS |
| INCORRECT WET AND DRY BULB TEMPERATURES. SEE APPENDIX D |
| FBC-14 PLUMBING, AS SHOWN IN THE TABLE THE DRY BULB |
| TEMP FOR WPB IS 91 DEGREES, AND THE WET BULB IS 79 |
| DEGREES: PLEASE CORRECT THE PLAN. |
| 5) M1.1: BALANCED RETURN AIR IS REQUIRED FOR AHU-1, |
| HOWEVER THE PLAN DOESN'T SHOW HOW AIR BEING SUPPLIED |
| INTO THE GEN. MANAGER'S OFFICE AND THE MIDDLE CONSULT |
| ROOM IS BEING RETURNED TO THE UNIT- SEE SECTION 601.5 |
| FBC-14 MECHANICAL. |
| 6) PROVIDE SITE SPECIFIC WIND LOAD TIE DOWN ENGINEERING |
| FOR THE NEW ROOF TOP EXHAUST FANS- SECTION 301.15,, AND |
| SUBMIT NOA'S OR FL. PRODUCT APPROVALS FOR THE EQUIPMENT |
| REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL OF |
| RECORD. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |