Date |
Text |
2015-11-19 16:59:50 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| MARSHAL, WITH THE FORLLOWING COMMENTS: |
| |
| 1. SHEET T 1 - PROJECT DATA INDICATES A PROPOSED |
| BUSINESS AND ASSEMBLY OCCUPANCY. IS THE PROPOSED A |
| SINGLE 2 STORY OCCUPANCY OR TWO INDIVIDUAL OCCUPANCIES? |
| IF SO IT IS A MIXED OCCUPANCY OR SEPARATED OCCUPANCY. |
| |
| 2. SHEET LS 1 - NO OCCUPANCY LOADS ARE INDICATED. |
| |
| BASED ON THIS REVIEW A FIRE SPRINKLER SYSTEM IS |
| REQUIRED. |
| |
| 3. SHEET LS 1 - THE INDICATED EXIT SEPARATION ON THE |
| 2ND FLOOR IS NOT CODE COMPLAINT. PER NFPA 101, CHAPTER |
| 7, 7.5.1.3.2, WHERE TWO EXITS, EXIT ACCESSES, OR EXIT |
| DISCHARGES ARE REQUIRED, THEY SHALL BE LOCATED AT A |
| DISTANCE FROM ONE ANOTHER NOT LESS THAN ONE-HALF THE |
| LENGTH OF THE MAXIMUM OVERALL DIAGONAL DIMENSION OF THE |
| BUILDING OR AREA TO BE SERVED, MEASURED IN A STRAIGHT |
| LINE BETWEEN THE NEAREST EDGE OF THE EXITS, EXIT |
| ACCESSES, OR EXIT DISCHARGES. |
| |
| 4. SHEETS A 1 - A 2 - NO DETAIL OF THE MEZZANINE IS |
| PROVIDED. |
| |
| NFPA 101 CHAPTER 8, 8.6.10.2.1 THE AGGREGATE AREA OF |
| MEZZANINES LOCATED WITHIN A ROOM, OTHER THAN THOSE |
| LOCATED IN SPECIAL-PURPOSE INDUSTRIAL OCCUPANCIES, |
| SHALL NOT EXCEED ONE-THIRD THE OPEN AREA OF THE ROOM IN |
| WHICH THE MEZZANINES ARE LOCATED. ENCLOSED SPACE SHALL |
| NOT BE INCLUDED IN A DETERMINATION OF THE SIZE OF THE |
| ROOM IN WHICH THE MEZZANINE IS LOCATED. |
| 8.6.10.2.3 FOR PURPOSES OF DETERMINING THE ALLOWABLE |
| MEZZANINE AREA, THE AGGREGATE AREA OF THE MEZZANINE |
| SHALL NOT BE INCLUDED IN THE AREA OF THE ROOM. |
| |
| THE PROPOSED MEZZANINE IS NOT APPROVED. |
| |
| 5. FIRE FIGHTER'S EMERGENCY OPERATIONS. ALL NEW |
| ELEVATORS SHALL CONFORM TO THE FIRE FIGHTER'S EMERGENCY |
| OPERATIONS REQUIREMENTS OF ASME A17.1/CSA B44, SAFETY |
| CODE FOR ELEVATORS. |
| |
| 6. SHEET LS 1 - THE EXIT WIDTH AT THE FRONT DOOR IS NOT |
| ADAQUATE FOR THE OCCUPANCY LOADS. |
| |
| 7. SHEET A 1 - THERE APPEARS TO BE A COLUMN SUPPORTING |
| THE MEZZANINE IN THE EXIT PATH FROM THE 2ND FLOOR |
| STAIRWAY. NO DETAIL IS PROVIDED FOR THIS COLUMN, AND/OR |
| HEADROOM DIMENSIONS AND/OR FIRE RATING. |
| |
| 8. SHEET E 3 - SHOULD THE PROPOSED USE BE SEPARATE INTO |
| TWO OCCUPANCIES, THE FIRE ALARMS SHALL BE SEPARATED. |
| |
| 9. SHEET LS 1 - THE EXIT ARROW INDICATORS AT THE FIRST |
| FLOOR ELEVATOR LOBBY POINT TO INCORRECT DIRECTION; |
| TOWARDS THE UP STAIRWAY, PLEASE CORRECT. |
| |
| 10. SHEET A 1 - NO DETAIL IS INDICATED FOR THE 1ST |
| FLOOR FIRE RATED WALL AS IT INTERACTS WITH THE |
| MEZZANINE. IS THERE A FIRE RATING FOR THE EXPOSED AREAS |
| OF THE STRUCTURE OF THE MEZZANINE? |
| |
| 11. SHEET A 5 - DOORS 103 AND 202 REQUIRE PANIC |
| HARDWARE. |
| |
| 12. SHEET A 1 - THE ELEVATOR LOBBY SHALL BE SEPARATED |
| FROM THE EXIT COORIDOR ON BOTH FLOOR LEVEL. |
| |
| 13. SHEET A 3 - NO DETAIL IS PROVIDED FOR THE REAR EXIT |
| STAIRWAY. |
| |
| 14. SHEET A 1 - NOR FIRE RATING IS INDICATED FOR THE |
| THE FLOORING. |
| |
| PETER LEDUC |
| FIRE MARSHAL |
| 561-804-4709 |
| [email protected] |
| |