Date |
Text |
2016-01-14 11:35:12 | PLAN |
| REVIEW COMMENTS |
| |
| 1ST REVIEW: FBC FIFTH EDITION (2014) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: (ALSO SEE MARK |
| UPS ON DIGITAL PLANS FOR PERMIT #15110523.) |
| |
| 1) THE PLANS HAVE SEVERAL REFERENCES TO THE 2010 FBC. |
| THE FBC FIFTH EDITION (2014) WENT INTO EFFECT ON JUNE |
| 30, 2015. ALL NEW PERMITS APPLIED FOR ON OR AFTER THAT |
| DATE ARE REQUIRED TO COMPLY WITH AND REFERENCE THE FBC |
| FIFTH EDITION. CHECK CODE SECTIONS AND THE EDITION OF |
| THE CODE THAT IS CITED IN THE PLANS. I CLOUDED MOST OF |
| THEM IN RED ON THE PLANS. |
| |
| 2) THE EMERGENCY MEANS OF ESCAPE NOTE AT THE ENTRY DOOR |
| IS INCORRECT. THE DOOR IS REQUIRED TO BE IMPACT |
| RESISTANT AND IMPACT PROTECTION DEVICES CAN NOT BE USED |
| PER FBCR 310.4. |
| |
| 3) THE CODE SECTION FOR UNDER STAIR PROTECTION IS |
| R302.7 IN THE 2014 FBCR AND NOT R311.2.2 |
| |
| 4) THE ROOF COVERING NOTES ON C2 AND C3 REFERENCE THE |
| 2010 FBC. |
| |
| 5) THE GENERAL NOTES TYPICAL TO UNITS A, B AND C |
| REFERENCE THE 2010 FBC AND WRONG CODE SECTIONS IN |
| SEVERAL PLACES. |
| |
| 6) THE FLAME SPRED AND SMOKE DEVELOPED NOTE #19 IS |
| INCORRECT. INSULATION MATERIALS SHALL HAVE A FLAME |
| SPRED INDEX NOT TO EXCEED 25 PER FBCR 302.10.1. SEE FBC |
| R302.9.1 AND R302.9.2 FOR FLAME SPREAD AND SMOKE |
| DEVELOPED REQUIREMENTS FOR WALL AND CEILING FINISHES. |
| |
| 7) THERE IS A DETAIL FOR A SHADOW BOX WOOD FENCE (WING |
| WALL) IN THE DOCUMENTS THAT NEEDS TO BE REMOVED. A |
| SEPARATE PERMIT, APPLICATION AND DRAWINGS ARE REQUIRED |
| FOR FENCES. THE DETAIL DOES NOT SPECIFY THE HEIGHT AND |
| DOES NOT PROVIDE AND STRUCTURAL DETAILS. FBC 107.2.1 |
| |
| 8) THE -50 PSF DESIGN PRESSURE IN PRODUCT APPROVAL |
| FL15037.3 FOR THE ENTRY DOOR IS NOT ADEQUATE. THE PLANS |
| SPECIFY A REQUIRED NEGATIVE PRESSURE OF -55.08 PSF FOR |
| THE DOOR. FBC R301.1 |
| |
| 9) THE ANCHOR SPACING COLUMN ON THE STORM PANEL |
| INSTALLATION SCHEDULE FOR 1441-A END UNIT IS BLANK. THE |
| ANCHOR SPACINGS ARE MISSING. FBC 107.2.1 |
| |
| 10) THE STORM PANEL INSTALLATION SCHEDULES FOR END |
| UNITS A AND B ARE MISSING THE WINDOWS ON THE ENDS. FBC |
| 107.2.1 |
| |
| 11) SUBMIT TWO COPIES OF A KEY PLAN THAT CORRESPONDS |
| WITH THE STORM PANEL INSTALLATION SCHEDULE TO SHOW THE |
| LOCATIONS OF THE OPENINGS. FBC 107.2.1 |
| |
| 12) SOME OF THE PLAN SHEETS AND DOCUMENTS ARE NOT |
| SIGNED AND SEALED. VERIFY THAT ALL REQUIRED SUBMITTALS |
| ARE SIGNED AND SEALED. FS 471 AND 481 |
| |
| 13) IN ORDER TO REDUCE PLAN REVIEW TIME, PLEASE SUBMIT |
| A RESPONSE LETTER INDICATING HOW EACH OF THE REVIEW |
| COMMENTS HAS BEEN ADDRESSED. |
| |
| |