Date |
Text |
2015-11-16 16:18:14 | 1ST REVIEW: FBC 2014 |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| 561-805-6711 |
| [email protected] |
| |
| PLUMBING COMMENTS: |
| |
| 1.PLEASE PROVIDE CALCULATIONS FOR ROOF SCUPPERS AND |
| DOWN SPOUTS. |
| PER WPB AMEND.TO FBC 107.2.1 |
| 2.EMERGENCY OVERFLOW SCUPPERS ARE REQUIRED. |
| PER.FBC P SEC 1108.1 |
| (A) EMERGENCY OVERFLOW SCUPPERS SHALL COMPY WITH FBC |
| SEC.1503.4.2.1 OVERFLOW SCUPPERS. |
| WHEN OTHER MEANS OF DRAINAGE OF OVERFLOW WATER IS NOT |
| PROVIDED, OVERFLOW SCUPPERS SHALL BE PLACED IN WALLS OR |
| PARAPETS NOT LESS THAN 2 INCHES (51 MM) NOR MORE THAN 4 |
| INCHES (102 MM) ABOVE THE FINISHED ROOF COVERING AND |
| SHALL BE LOCATED AS CLOSE AS PRACTICAL TO REQUIRED |
| VERTICAL LEADERS OR DOWNSPOUTS OR WALL AND PARAPET |
| SCUPPERS. AN OVERFLOW SCUPPER SHALL BE SIZED IN |
| ACCORDANCE WITH THE FLORIDA BUILDING CODE, PLUMBING. |
| 3. SHEET P2 RISER DIAGRAM WASHING MACHINE IS NOT |
| VENTED. |
| PER FBCP SEC. 901.2.1 |
| 4.SHEET P2 RISER DIAGRAM DOUBLE LAVS IN BATHROOM 1 NOT |
| VENTED. |
| PER FBCP SEC 901.2.1 |
| 5. DRAIN LINES FROM KITCHEN MASTER BATHROOM AND LAUNDRY |
| MUST CONNECT TO BUILDING DRAIN SEPARATELY THEY CANNOT |
| CONNECT TO POWDER ROOM SANITARY PIPING. |
| PER FBC SEC 912.1 |
| 6. PROVIDE MANUFACTURE INSTALLATION INSTRUCTIONS FOR |
| TANKLESS WATER HEATER. |
| PER WPB AMEND.TO FBC 107.2.1 |
| 7. SEPERATE PERMIT EQUIRED FOR GAS |
| GAS PERMIT APPLICATION REQUIREMENTS |
| |
| EFFECTIVE IMMEDIATELY THE FOLLOWING INFORMATION SHALL |
| BE SHOWN ON ALL GAS DRAWINGS SUBMITTED FOR PERMITTING |
| IN THE CITY OF WEST PALM BEACH: |
| |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. |
| |
| 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS |
| STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. WPB |
| AMENDMENTS TO FBC SEC. 107.2.1. |
| |
| 3. TYPE OF GAS, (LP OR NATURAL). |
| |
| 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| THE SYSTEM. REFER TO THE FBC-2014 FUEL GAS SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(37). |
| |
| 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? |
| USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE |
| SEC. 402.4.1. |
| |
| 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| FBC-2014 FUEL GAS CODE SEC. 304. |
| |
| 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014 |
| FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 |
| PSI. |
| |
| 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE |
| SEC. 502 THRU 505. |
| |
| 9. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| |
| 10. CLEARLY SHOW THE LOCATION AND CAPACITY OF LP |
| TANK(S), TYPE OF TANK (DOT OR ASME), THE DISTANCE OF |
| THE TANK FROM THE BUILDING AND ADJACENT PROPERTY LINES |
| THE DISTANCE OF THE TANK FROM ALL SOURCES OF IGNITION, |
| OTHER CONTAINERS, BUILDINGS, AND THE LOCATION OF ANY |
| BUILDING OPENINGS BELOW THE RELIEF VALVE OF THE TANK |
| PER NFPA 58, TABLE 3-2.2.2. |
| |
| 11. CLEARLY INDICATE ON THE PLAN IF THE LP TANK IS |
| ABOVE OR BELOW GROUND, AND SHOW REQUIRED PROTECTION OF |
| THE TANK AND APPURTENANCES PER NFPA 58. IF THE TANK IS |
| BELOW GROUND THE CONTAINER SHALL BE SECURELY ANCHORED |
| PER NFPA 58 SECTION 3-2.2.7(H). |
| |