2015-09-21 16:06:09 | CONDITIONS OF PERMIT: |
| 1. EXTENTS OF INSTALLATION SHALL BE EXCLUSIVELY WITHIN |
| THE FPUC EASEMENT. |
| 2. ALL UTILITY PERMITS ISSUED WILL CONTAIN A PROVISION, |
| WITHIN THE LIMITS OF THE LAW, TO INDEMNIFY AND HOLD THE |
| CITY HARMLESS FROM ANY AND ALL LIABILITY STEMMING FROM |
| THE AUTHORIZED INSTALLATION. |
| 3. CROSSING SHALL BE INSTALLED A MINIMUM OF 60 INCHES |
| BELOW THE DESIGN BOTTOM OF THE CANAL AND A MINIMUM OF |
| 36 INCHES BELOW ALL BERMS AND SIDE SLOPES. |
| 4. ALL STRUCTURES LIDS SHALL HAVE A MINIMUM HS-20 |
| (TRAFFIC BEARING) LOAD RATING. |
| 5. ALL UNDERGROUND UTILITY INSTALLATIONS MUST BE |
| IDENTIFIED WITH CITY ABOVE GROUND REFLECTIVE WITNESS |
| MARKERS. |
| 6. PERMITTEE SHALL SUBMIT RECORD DRAWINGS AND PROJECT |
| COMPLETION CERTIFICATION. DRAWINGS SHOULD SHOW, AS A |
| MINIMUM, LOCATION, DEPTH OF COVER. |
| 7. NPDES / BMP'S MUST BE IN PLACE PRIOR TO |
| COMMENCEMENT. CALL CITY OF WPB ENGINEERING CONSTRUCTION |
| COORDINATOR (561) 494-1085 (48 HOURS PRIOR TO |
| COMMENCEMENT.) |
| 8. THEOWNER IS ADVISED THAT THE CITY'S FIBER OPTIC |
| CABLE IS LOCATED IN CLOSE PROXIMITY OF THE PROPOSED |
| PROJECT. THE CONTRACTOR SHALL LOCATE AND PROTECT THIS |
| FIBER OPTIC CABLE DURING CONSTRUCTION. |
| |
| MANUEL JULIAN GONZALEZ |
| ENGINEERING PROJECT COORDINATOR |
| PUBLIC WORKS DEPARTMENT |
| 401 CLEMATIS STREET, 4TH FLOOR |
| WEST PALM BEACH, FL 33401 |
| (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402) |
| MAIN PHONE: (561) 822-1200 |
| DIRECT: (561) 494-1085 |
| FAX: (561) 494-1116 |
| EMAIL: [email protected] |
| WWW.WPB.ORG/ENGINEERING |
| |