Date |
Text |
2016-01-30 12:04:51 | 1) SHT. P-5 - THE NOTE ON THE PLAN REFERS TO GAS TABLE |
| 402.4 (2). THIS TABLE IS FOR A SYSTEM WITH LESS THAN 2 |
| PSI BUT THE PLANS ALSO NOTE THAT THE INLET PRESSURE IS |
| 2 PSI. WHICH IS IT? I CANNOT DO A THOROUGH REVIEW ON |
| THE GAS UNLESS THE CORRECT PRESSURE AND PROPER SIZING |
| TABLE ARE ON THE PLANS. |
| 2) SHT. P-5 - THE PLANS REFER TO THE 2007 FUEL GAS |
| CODE. THE CODE IN EFFECT FOR THIS PROJECT IS THE 2010 |
| FBC & FUEL GAS CODE. |
| 3) THE GAS PLAN NOTES THE BTU LOAD IS 667K BUT MY |
| CALCULATIONS ARE 906K. PLEASE CHECK YOUR CALCULATIONS. |
| 4) SUBMIT AN EXPANDED SANITARY RISER FOR THE SECOND |
| FLOOR. IT IS EXTREMELY DIFFICULT TO SEE WHERE ONE LINE |
| STOPS AND ANOTHER BEGINS.DON'T OVERLAY THE FIRST FLOOR |
| RISER FOR THE GREASY WASTE WITH THE 2ND FLOOR RISER. |
| SHT. P-5 - THE FIXTURES IN THE FOOD PREP AREA ARE NOT |
| ON THE WATER RISER. CLARIFY. |
| 5) SHT. P-5- THE 2ND FLOOR WATER RISER REFERS TO THE |
| 3RD FLOOR. CLARIFY. WHERE IS THE WATER RISER CONNECTION |
| TO THE FIRST FLOOR? |
| 6) SHT. P-6 - FIRST FLOOR GREASY WASTE - THE VENT IS |
| MISSING FOR THE TWO FLOOR SINKS IN THE FOOD PREP ARREA. |
| 7) THE AIR ADMITTTANCE VALVE (STUDOR VENT) IS MISSING |
| ON THE FIRST FLOOR GREASY WASTE RISER IN THE BAR AREA. |
| 8) IDENTIFY THE AIR ADMITTANCE VALVES ON THE 2ND FLOOR |
| GREASY WASTE. |
| 9) SHT.P-6 - THE SECOND FLOOR GREASY WASTE STILL SHOWS |
| THE ICE BINS DISCHARGING INTO THE GREASY WASTE. WASTES |
| THAT DO NOT REQUIRE SEPARATION OR TREATMENT SHALL NOT |
| BE DISCHARGED INTO ANY INTERCEPTOR OR SEPARATOR PER THE |
| 2010 FBC- PLUMBING SEC.1003.2. 3RD REQUEST. |
| 10) THE SPECIFICATIONS FOR THE GAS APPLIANCES HAVE NOT |
| BEEN SUBMITTED. SUBMIT MANUF. SPECS FOR THE GAS |
| EQUIPMENT.3RD REQUEST. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |
| |
| |
| |