Date |
Text |
2015-09-18 08:48:07 | 1) SUBMIT MANUFACTURER'S SPECIFICATIONS/INSTALL MANUAL |
| FOR THE ZURN GREASE INTERCEPTOR FOR REVIEW. WPB AMEND. |
| TO FBC SEC.107.2.1, 107.3.5.1.3. |
| 2) SUBMIT INTERCEPTOR SIZING CALCULATIONS. THE |
| INTERCEPTOR SHALL BE SIZED IN ACCORDANCE WITH ONE OF |
| THE METHODS LISTED IN THE 2010 FBC SEC.1003.3.4. |
| 3) SUBMIT A REVISED KITCHEN EQUIPMENT SCHEDULE. THE |
| PLANS SHOW A NEW GRIDDLE AND FRYER BUT NO INFORMATION |
| HAS BEEN SUBMITTED FOR THESE APPLIANCES. |
| 4) INDICATE ON THE PLANS IF THE GRIDDLE AND FRYER ARE |
| GAS OR ELECTRIC. IF THE APPLIANCES ARE GAS, THEN SUBMIT |
| MANUF. SPECS FOR THE EQUIPMENT AND SUBMIT A COMPLETE |
| GAS DRAWING FOR REVIEW. IF THE APPLIANCES ARE ELECTRIC, |
| SUBMIT COMPLETE ELECTRIC PLANS FOR REVIEW.WPB AMEND. TO |
| FBC SEC. 107.2.1. |
| 5) THE PLANS FOR THIS PLUMBING REVISION SHOW CHANGES |
| FRROM THE ORIGINAL PLANS THAT APPEAR TO AFFECT |
| STRUCTURAL, MECHANICAL AND ELECTRICAL DISCIPLINES. |
| SUBMIT A COMPLETE SET OF PLANS THAT REFLECTS THE ENTIRE |
| SCOPE OF CHANGES THAT HAVE BEEN MADE FROM THE ORIGINAL |
| PLANS. WPB AMEND. TO FBC SEC. 107.2.1. |
| 6) SHT.P-4 - SHOWS THE DRAINS FROM ICE BINS DISCHARGING |
| INTO THE GREASE INTERCEPTOR.WASTES THAT DO NOT REQUIRE |
| TREATMENT OR SEPARATION SHALL NOT BE DISCHARGED INTO |
| ANY INTERCEPTOR OR SEPARATOR PER 2010 FBC-PLUMBING |
| SEC.1003.2. |
| 7)THE GREASE INTERCEPTOR SHALL HAVE THE GREASE |
| RETENTION CAPACITY INDICATED IN TABLE 1003.3.4.1 OF |
| FBC-PLUMBING FOR THE FLOW THROUGH RATES INDICATED. |
| 8) GREASE INTTERCEPTORS SHALL BE EQUIPPED WITH DEVICES |
| TO CONTROL THE RATE OF WATER FLOW SO THAT THE WATER |
| FLOW DOES NOT EXCEED THE RATED FLOW PER FBC-PLUMBING |
| SEC.1003.3.4.2. |
| 9) INDICATE THE TYPE OF COOKING OPERATIONS THAT WILL BE |
| DONE IN THE STRUCTURE.WPB AMEND. TO FBC SEC. 107.2.1. |
| 10) SUBMIT A WATER RISER FOR REVIEW. WPB AMEND. TO FBC |
| SEC. 107.3.5.1.3. |
| |
| WHEN A COMPLETE SET OF PLANS ARE SUBMITTED THAT SHOW |
| ALL THE CHANGES TO THE BUILDING, ELECTRICAL, MECHANICAL |
| AND PLUMBING SYSTEMS THOSE PLANS WILL BE REVIEWED BY |
| EACH DISCIPLINE. THE PLANS MUST BE SUBMITTED AS A |
| COMPLETE PACKAGE. |
| |
| PLUMBING PLAN REVIEW |
| TIM LARGE |
| CHIEF PLUMBING INSPECTOR |
| 561-805-6692 |
| [email protected] |
| |
| |