2015-09-25 16:29:33 | 1ST REVIEW FBC 2014 MECHANICAL |
| PERMIT #15090611 |
| 9/25/15 |
| |
| 1) SHEET M6.1: THE O/A CALCULATIONS AND THE AIR BALANCE |
| SCHEDULE NEED TO BE CORRECTED TO BE IN COMPLIANCE WITH |
| TABLE 403.3 FBC-14 MECHANICAL: A) OARTU-1 IS SUPPLYING |
| AIR FOR BOTH THE STUDIO AND THE KITCHEN. BASED ON THE |
| ARTISTIC RENDITION OF THIS AREA SHOWN ON THE COVER |
| SHEET OF THE PLANS, THE STUDIO AREA APPEARS TO BE USED |
| FOR EITHER DOING ART WORK OR VIEWING ART WORK. |
| THEREFORE, USING TABLE 403.3, PROVIDE CALCULATIONS FOR |
| EITHER ART STUDIO OR MUSEUMS/GALLERIES. THE KITCHEN |
| AREA PER TABLE 403.3 MUST BE CALCULATED USING .7 PER |
| SQ. FT. EXHAUST RATE. IF AIR IS TO BE PROVIDED FOR |
| KITCHEN OCCUPANTS PLEASE SHOW THAT CALCULATION, AND |
| RE-CONFIGURE THE PLANS AND AIR BALANCE SCHEDULE PER THE |
| REVISED CALCULATIONS. PLEASE NOTE THAT THE1190 CFMS FOR |
| 15 OCCUPANTS SHOWN IN THE SCHEDULE AMOUNTS TO |
| APPROXIMATELY 80 CFM PER OCCUPANT, HOWEVER YOUR |
| CALCULATIONS ARE BASED ON 5 CFM PER OCCUPANT. B) REVISE |
| THE O/A CALCULATIONS IN THE SAME MANNER FOR RTU-1 |
| SERVING THE GALLERY, AND AHU-1 WHICH IS ALSO SERVING A |
| GALLERY AREA. |
| 2) BASED ON THE REVISED O/A CALCULATIONS REFER TO TABLE |
| C403.2.6 FBC-14 ENERGY CONSERVATION AND REVIEW FOR |
| APPLICABILITY TO THE PROPOSED OARTU-1 INSTALLATION. |
| 3) M6.1: PROVIDE AN EQUIPMENT SCHEDULE FOR DHMF-1. |
| INDICATE HOW THIS UNIT WAS SIZED AND PROVIDE CONTROLS |
| OPERATION DETAILS. |
| 4) PROVIDE INSTALLATION DETAILS FOR DHMF-1 AND AHU-1 |
| 5) DUCT SMOKE DETECTORS ARE REQUIRED TO BE INSTALLED IN |
| THE RETURN AIR SYSTEMS OF OARTU-1 AND RTU-1. |
| 6) ENERGY FORM 506-2014: PLEASE ADD THE COMPLIANCE DATA |
| FOR THE NEW FENESTRATION, AND COMPLETE THE MANDATORY |
| REQUIREMENTS CHECKLIST BEGINNING ON PAGE 7. |
| 7) PLEASE PLACE A NOTE ON THE KITCHEN HOOD WILL BE DONE |
| UNDER A SEPARATE PERMIT AS REQUIRED BY THE WPB |
| CONSTRUCTION SERVICES DEPT. |
| 8) SHEET A1.2: SHOW THE LOCATION OF CU-1. |
| 9) PROVIDE CONDENSATE DISPOSAL PLANS AND DETAILS FOR |
| THE NEW AC SYSTEMS- SECTION 307. |
| 10) PROVIDE STRUCTURAL DETAILS FOR THE NEW RTU ROOF |
| OPENINGS, AND WINDLOAD TIE DOWN ENGINEERING FOR ALL |
| ROOF TOP HVAC APPLIANCES AND EQUIPMENT- SECTION 301.15 |
| FBC-4 MECHANICAL. |
| |