2016-02-12 12:51:33 | 3RD REVIEW: FBC 2014 MECHANICAL |
| PERMIT #15090393 : MODEL A- #1210. |
| 2/12/16 |
| |
| 1) THERE ARE SEVERAL CONFLICTS BETWEEN THE AC COOLING |
| LOAD CALCULATIONS, THE ENERGY CALCULATIONS AND THE AC |
| PLANS. |
| A) THE AC CALCULATIONS INDICATE A 4-TON LOAD FOR AC |
| A-01 WHICH IS CONDITIONING THE 1ST LEVEL, HOWEVER SHEET |
| M401 INDICATES A 3-TON SYSTEM FOR THE 1ST LEVEL SYSTEM. |
| PLEASE NOTE THAT THE SYSTEM IS MISLABED AC-B, AND REFER |
| TO SECTION R403.6.1.1FBC-14 ENERGY CONSERVATION WHICH |
| REQUIRES SYSTEMS TO BE SIZED NOT LESS NOT THAN THE |
| CALCULATED LOADS. |
| B) AC CALCULATIONS HAVE BEEN SUBMITTED FOR ACA- 02 |
| HOWEVER THE PLANS ARE INDICATING ACB-02. |
| C) AC CALCULATIONS HAVE BEEN SUBMITTED FOR VAV A-01B, |
| HOWEVER THAT SYSTEM IS NOT SHOWN ON THE PLANS. |
| D) THE SUBMITTED ENERGY CALCULATION FORM R405-2014 |
| SHOWS COMPLIANCE DATA FOR A SINGLE COOLING SYSTEM WHICH |
| APPEARS TO ACTUALLY BE COMPLIANCE DATA FOR THE TWO |
| 4-TON SYSTEMS SHOWN IN THE SCHEDULE COMBINED AND |
| AVERAGED. PLEASE PROVIDE COMPLIANCE DATA FOR EACH |
| INDIVIDUAL SYSTEM AND COMPARE WITH THE PLANS WHICH |
| INDICATES A 3-TON AND A 4-TON SYSTEM. |
| E) THE AC CALCULATIONS ARE INDICATING THE FRONT DOOR |
| FACES EAST HOWEVER THE FRONT DOOR IS FACING NORTH. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |