2015-10-06 14:26:06 | ****CORRECTIONS**** | | | | SAMANTHA HILL | | BUILDING PLANS EXAMINER | | [email protected] | | 561-805-6724 | | | | FROM PREVIOUS LIST: | | | | 1. SEE PAGE 6. SPANS BETWEEN 6' AND 8'8" REQUIRE 6.5" | | SPACING, 12.5 PROPOSED (FOR EXAMPLE, SEE OPENINGS 2, 3, | | 5). PLEASE REVISE AND CHECK ALL. | | | | SPANS HAVE BEEN REVISED AND NOW APPEAR INCORRECT. | | | | SPAN IS DISTANCE ANCHOR TO ANCHOR. DIMENSIONS SHOULD BE | | WIDTH X HEIGHT. IF A PANEL IS INSTALLED HORIZONTALLY, | | "WIDTH" IS THE FIRST DIMENSION. FOR EXAMPLE, SEE | | OPENING 2. PREVIOUS INSTALLATIN SCHEDULE GAVE A SPAN OF | | 89.5. SINCE THE WIDTH OF THE OPENING IS 89.5, THE SPAN | | SHOULD BE 95.5", BUT NOW THE SPAN IS STATED AS 48". | | | | IF SPANS ARE INCORRECT, ANCHOR SPACING CANNOT BE | | REVISED. | | | | PLEASE HAVE QUALIFIER REVIEW THE COMMENT LISTS AND THE | | ANCHOR SCHEDULES SUBMITTED PRIOR TO RESUBMITTAL. | | | | |
|