Date |
Text |
2015-09-02 11:23:21 | RESIDENTIAL (R3) ADDITION, MECHANICAL REVIEW COMMENTS. |
| CODE: 2010 FBC. |
| |
| 1- ADDITION ORIGINAL PERMIT APPLICATION WAS SUBMITTAL |
| VIA DIGITAL. THEREFORE, ALL SUBMITTALS NEED TO BE |
| DIGITAL AS WELL. SEC. 107.2.1.4 CITY AMENDMENTS. |
| |
| 2- EQUIPMENT LISTED ON THE AHRI CERTIFICATE SUBMITTED |
| DOESN'T MATCH EQUIPMENT LISTED ON THE A/C PLAN ON SHEET |
| 5 OF THE APPROVED ARCHITECTURAL DRAWINGS SUBMITTED. |
| NEED TO REVISE EITHER THE PLANS OR THE AHRI CERTIFICATE |
| AS REQUIRED TO MATCH. SEC. 107.2.1 CITY AMENDMENTS. |
| |
| 3- "THE CORRESPONDING LATENT CAPACITY OF THE EQUIPMENT |
| SHALL NOT BE LESS THAN THE CALCULATED LATENT LOAD" AS |
| REQUIRED BY SEC. 403.6.1.1 OF 2010 FBC-ENERGY |
| CONSERVATION. LATENT CAPACITY OF THE EQUIPMENT LISTED |
| ON SHEET 5 OF THE ARCHITECTURAL DRAWINGS DOESN'T |
| COMPLY. |
| |
| 4- REVISED ENERGY CALCULATIONS: |
| A) NEED TO HAVE THE NAME OF THE INDIVIDUAL COMPLETING |
| THE REPORT AS REQUIRED BY SEC. 405.4.2 OF 2010 |
| FBC-ENERGY CONSERVATION. |
| |
| B) NEED THE NAME AND SIGNATURE OF THE OWNER/AGENT AS |
| REQUIRED BY SEC. 103.2.3.2 OF 2010 FBC-ENERGY |
| CONSERVATION. |
| |
| 5- THE BUILDING PERMIT WAS APPROVED WITH PROVISO. |
| ENERGY CALCULATIONS ARE TAKING THE CROSS VENTILATION |
| CREDIT. INFORMATION WAS REQUESTED PROVIDING COMPLETE |
| INFORMATION FOR THE CROSS VENTILATION. SEE COPY OF |
| PROVISO BELOW. INFORMATION WAS NOT SUBMITTED YET. NEED |
| TO PROVIDE SUCH INFORMATION NOW TO AVOID CONFLICTS OR |
| UNNECESSARY DELAYS. |
| |
| |
| |
| BUILDING REVIEW APPROVED WITH PROVISO: |
| |
| 1- NEED TO SPECIFY CARBON MONOXIDE ALARMS WITHIN 10 |
| FEET OF EACH SLEEPING ROOM AS REQUIRED BY SEC. R315 OF |
| 2010 FBC-RESIDENTIAL. NOTE: THERE IS A CARBON MONOXIDE |
| ALARM SPECIFIED IN THE NEW KITCHEN, BUT THIS IS NOT |
| WHAT IT WAS REQUESTED. |
| |
| 2- ENERGY CALCULATIONS ARE TAKING THE CROSS VENTILATION |
| CREDIT. PLANS TO PROVIDE COMPLETE INFORMATION SHOWING |
| COMPLIANCE WITH ALL THE REQUIREMENTS OF SEC. 405.6.4 OF |
| 2010 FBC-ENERGY CONSERVATION. |
| ENERGY CALCULATIONS WERE NOT REVISED AS PER ARCHITECT'S |
| RESPONSE LETTER STATED. |
| |
| 3- PROVIDE COMPLETE REVISED TRUSS PACKAGE TO BUILDING |
| INSPECTOR AT TIME OF FRAMING INSPECTION. |
| |
| NOTE: REVISION FEES WILL APPLY AFTER PERMIT IS ISSUED. |