Plan Review Notes For Permit 15081167 |
Permit Number |
15081167 |
|
Review Stop |
P |
Sequence Number |
1 |
|
Notes |
Date |
Text |
2015-09-02 05:04:31 | 1) POOL SPECS BOX: THE TURNOVER RATE FOR THE POOL IS | | NOTED AS 6 HR. ? MIN. FOR 21,542 GALS. I HAVE | | CALCULATED A TURNOVER RATE OF 11.58 HOURS. CLARIFY. | | 2) SUBMIT 2 COPIES OF THE MANUFACTURER'S SPECIFICATIONS | | FOR THE HEAT PUMP. THE INFORMATION SHALL CLEARLY SHOW | | COMPLIANCE WITH THE 2014 FL. ENERGY CODE SEC.R403.9.1 & | | R403.9.1.2. HEAT PUMPS SHALL HAVE A MINIMUM COP OF 4.0 | | AND SHALL BE TESTED IN ACCORDANCE WITH AHRI 1160, TABLE | | 2.A TEST REPORT FROM AN INDEPENDENT LABORATORY IS | | REQUIRED TO VERIFY PROCEDURE COMPLIANCE. | | 3) 2014 FBC- ENERGY CODE SEC. R 403.9.2 - TIME SWITCHES | | OR OTHER CONTROL METHODS THAT CAN AUTOMATICALLY TURN | | OFF AND ON HEATERS AND PUMPS ACCORDING TO A PRESET | | SCHEDULE SHALL BE INSTALLED ON ALL HEATERS AND PUMPS. | | HEATERS, PUMPS AND MOTORS THAT HAVE BUILT IN TIMERS | | SHALL BE DEEMED IN COMPLIANCE WITH THIS REQUIREMENT. | | 4) SUBMIT A COPY OF THE PUMP CURVE FOR THE POOL/SPA | | PUMP AND IDENTIFY THE TOTAL DYNAMIC HEAD CALCULATIONS | | PER FOR THIS POOL PER ANSI/APSP-7 SEC. 4.4.1. | | 5) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR BOTH | | CHANNEL DRAINS TO ENSURE COMPLIANCE WITH ANSI/APSP-7 | | SEC.5.5.1 | | | | | | | | PLUMBING PLAN REVIEW | | TIM LARGE | | CHIEF PLUMBING INSPECTOR | | 561-805-6692 | | [email protected] | | | | | | |
|