| PLAN |
| REVIEW COMMENTS |
| |
| 1ST REVIEW: FBC FIFTH EDITION (2014) |
| ROBERT MCDOUGAL, CBO |
| COMMERCIAL COMBINATION PLANS EXAMINER |
| (561) 805-6714 |
| [email protected] |
| |
| DENIED BY BUILDING |
| PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| |
| 1) SUBMIT TWO SETS OF FLOOR PLANS THAT SHOW THE WINDOW |
| TYPES AND SIZES. THE PLANS THAT WERE SUBMITTED ONLY |
| HAVE THE REQUIRED WIND LOAD PRESSURES. FBC 107.2.1 |
| |
| 2) THE PRODUCT APPROVAL THAT WAS SUBMITTED FOR THE |
| SINGLE HUNG WINDOWS (FL14604.3) HAS A MAXIMUM DESIGN |
| PRESSURE OF +50, -50 PSF. THE REQUIRED DESIGN WIND LOAD |
| PRESSURES LISTED ON SHEET A1 OF THE PLANS IS HIGHER, |
| THEREFORE THESE WINDOWS CAN NOT BE USED. FBC - R301.2.1 |
| |
| 3) FBC-R301.2.1.2 REQUIRES GLAZED OPENING TO BE |
| PROTECTED FROM WINDBORNE DEBRIS. SUBMIT TWO SETS OF |
| PRODUCT APPROVALS, KEY PLANS AND INSTALLATION SCHEDULES |
| FOR THE STORM PANELS. |
| |
| 4) IF ANY OF THE OPENINGS HAVE TWO OR MORE WINDOWS THAT |
| ARE CONNECTED WITH STRUCTURAL MULLIONS, THEN SUBMIT TWO |
| SETS OF THE PRODUCT APPROVALS FOR THE MULLIONS THAT |
| WILL BE USED. DCA RULE 9N-3 |
| |
| 5) WINDOWS THAT ARE LOCATED IN HAZARDOUS LOCATIONS, |
| SUCH AS BATHROOMS, REQUIRE SAFETY GLAZING. SPECIFY |
| THESE WINDOWS ON THE PLANS. FBC-R 308.4 |
| |
| 6) THE VALUE SPECIFIED ON THE APPLICATION OF $2,700.00 |
| IS TOO LOW FOR THE REPLACEMENT OF WINDOWS IN 23 |
| OPENINGS. FBC 109.3 |
| |
| 7) IN ORDER TO REDUCE PLAN REVIEW TIMES AND PROVIDE |
| CLARIFICATION, PLEASE SUBMIT A RESPONSE LETTER |
| INDICATING HOW EACH OF THE REVIEW COMMENTS HAS BEEN |
| ADDRESSED. |