2015-10-15 15:03:15 | 2ND REVIEW: FBC 2014 MECHANICAL |
| PERMIT #15080942 |
| 10/15/15 |
| |
| 1 ) 2ND REQUEST FOR AC LOAD CALCULATIONS. REFER TO |
| COMMENT #1 FROM 1ST REVIEW: SECTION C403.2.1 FBC-14 |
| ENERGY CONSERVATION: CALCULATION OF HEATING AND COOLING |
| LOADS. |
| DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE |
| PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR |
| ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE |
| COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT |
| WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE |
| MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE |
| SIZING CALCULATION SHALL BE SUBMITTED WITH THE |
| APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND |
| COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD |
| REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY |
| SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE |
| WITH THE ASHRAEHVAC SYSTEMS AND EQUIPMENT HANDBOOK. |
| ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN |
| APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE |
| DESIGN PARAMETERS SPECIFIED IN CHAPTER 3. |
| 2) 2ND REQUEST FOR CONDENSER TIE-DOWN ENGINEERING. |
| PROVIDE STRUCTURAL DETAILS FOR THE INSTALLATION OF THE |
| CONDENSER PAD, AND WIND LOAD-TIE DOWN ENGINEERING FOR |
| MOUNTING THE CONDENSER TO THE PAD- SECTION 301.15 |
| FBC-14 MECHANICAL. |
| |
| CHRISTOPHER L. COLE |
| MECHANICAL PLANS EXAMINER |
| 561-805-6719 |
| [email protected] |
| |