2015-09-05 08:43:171) SHT.1.0 (A) - THE ACCESSIBILITIY FIGURES ARE FROM A
 PREVIOUS CODE EDITION. SUBMIT THE CORRECT FIGURES FROM
 THE 2014 FBC-ACCESSIBILITY.
 2) THE OCCUPANT LOAD IS SHOWN AS 156 PERSONS. THE
 NUMBER OF WATER CLOSETS IS DEFICIENT FOR THE OCCUPANT
 LOAD. COMPLY WITH 2014 FBC-PLUMBING TABLE 403.1.
 3) SHT.1.1 (A). SHOW THE BTU LOAD FOR EACH GAS
 APPLIANCE ON THE EQUIPMENT SCHEDULE.WPB AMEND. TO FBC
 SEC. 107.2.1.
 4) SHT.3.1P - THE GAS TABLE REFERENCED IS FOR UNDILUTED
 PROPANE @10 PSI BUT THE PLAN NOTES 11 INCH WATER COLUMN
 WITH A .5 PRESSURE DROP SYSTEM. CLARIFY.
 5) A THOROUGH REVIEW OF THE GAS SYSTEM CANNOT BE DONE
 UNTIL THE THE CORRECT SIZING TABLE IS SUBMITTED.
 6) THE GAS LOAD CALC TABLE LISTS AN 1 1/2 INCH GAS LINE
 TO THE HOT PLATE AND THIS LINE IS FED BY A 1 INCH LINE?
 THIS DOES NOT MAKE SENSE. CLARIFY.
 7) SIZE ALL PIPE SECTION OF THE GAS RISER. WPB AMEND.
 TO FBC SEC. 107.2.1. THE ENTIRE SYSTEM SHALL BE SIZED
 USING THE 150 FEET COLUMN.
 8) THE HOT PLATE IS NOT SHOWN ON THE GAS RISER.
 CLARIFY.
 9) WHAT IS THE NUMBER "2138K ON THE GAS DRAWING?
 10) SHT. 3.1P NOTES THE GAS IS SIZED PER 2010 FUEL GAS
 CODE. IF THIS IS NEW PIPING, IT SHALL BE SIZED PER THE
 2014 FUEL GAS CODE.
 11) THE WATER CLOSET IN THE MEN'S RESTROOM IS MISSING
 FROM THE SANITARY RISER.
 12) THE SANITARY VENT FOR THE TOILET ROOMS GOES
 NOWHERE. CLARIFY.
 13) SHOW CONTINUATION POINT OF THE SANITARY VENT FOR
 THE MOP SINK.
 14) SUBMIT DETAILS FOR THE VENT FOR THE TANKLESS WATER
 HEATER.
 15) THE LAYOUT OF THE DRAIN FOR THE ICE BIN/ICE MAKER
 ON THE PLAN VIEW DOES NOT MATCH THE RISER DIAGRAM.
 CLARIFY.
 16) IF THE WASTE FROM THE ICE MAKER/ICE BIN IS CLEAR
 WATER WASTE, IT SHALL NOT BE DISCHARGED TO THE GREASY
 WASTE AS SHOWN. CLARIFY.2014 FPC SEC. 1003..2.
 17) SHT. 3.1P - SHOWS A RINSE FAUCET LABELED AS GW
 DISCHARGING TO THE SANITARY. CLARIFY.MY CALCULATIONS
 FOR THE GREASE INTERCEPTOR ARE 1856 NOT 1956. CORRECT
 THE CALCULATIONS ON THE PLANS.
 18) SHT. 3.1P - SHOWS THE SANITARY DISCHARGING TO THE
 GREASE INTERCEPTOR AND THE GREASY WASTE TO NOWHERE.
 CLARIFY.
 19) SHOW THE SIZE AND LOCATION OF THE LP TANK. INDICATE
 IF IT IS NEW OR EXISTING, ABOVE GROUND OR UNDERGROUND,
 NEAR A TRAFFIC AREA OR WHERE TRAFFIC COULD BE EXPECTED,
 ETC.
 20) SHOW THE DISTANCE OF THE LP TANK FROM THE
 STRUCTURE.
 21) SUBMIT WIND LOAD ENGINEERING FOR THE TANK IF IT IS
 ABOVEGROUND. 2014 FGC SEC.301.10.
 22) SUBMIT A WATER RISER DIAGRAM FOR REVIEW. WPB AMEND.
 TO FBC SEC. 107.3.5.1.3.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved