Date |
Text |
2015-09-02 16:27:15 | 1ST REVIEW: FBC 2014 |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER |
| 561-805-6711 |
| [email protected] |
| |
| |
| |
| PLUMBING COMMENTS: |
| |
| 1. ON SHEET P2.1 YOU HAVE 1ST FLOOR BAR FLOOR SINKS |
| TIED INTO THE GREASE WASTE. IS THERE GREASE LADEN WASTE |
| BEING DUMPED INTO THESE DRAINS. IF NOT IT CANNOT BE |
| TIED INTO GREASE WASTE SYSTEM. |
| PER. FBCP 2010 SEC. 1003.2 |
| 2. ON SHEET P2.1 YOU SHOW 2 GREASE INTERCEPTORS YOU |
| LIST SCHIER GB 75 WITH A 750 GPM ACCORDING TO THE SPECS |
| FROM SCHIER A GB75 HAS 75 GPM PLEASE CLARIFY. |
| WPB AMEND. 107.2.1 |
| 3. SHEET P2.1 YOUR CALCULATIONS FOR THE GREASE |
| INTERCEPTOR ONLY APPEAR TO HAVE KITCHEN FIXTURES. ALL |
| FIXTURES INCLUDING FLOOR DRAINS THAT ARE CONNECTED TO |
| GREASE WASTE MUST BE INCLUDED IN CALCULATIONS. WPB |
| AMEND. 107.2.1 |
| 4. IF THE FIRST FLOOR BAR FLOOR SINKS ARE RECEIVING |
| GREASE LADEN WASTE. ARE THE SECOND AND THIRD FLOOR BARS |
| ALSO RECEIVING GREASE LADEN WASTE. WPB AMEND. 107.2.1 |
| 5. ON THE THIRD FLOOR YOUR SHOWING A GRILL AND GRIDDLE, |
| WILL THE GREASE FROM CLEANING THE APPLIANCE BE BROUGHT |
| DOWN TO THE FIRST FLOOR AND DUMPED INTO THE GREASE |
| SYSTEM PLEASE CLARIFY. |
| WPB AMEND. 107.2.1 |
| 5. SEPARATE GAS PERMIT REQUIERED. FOR COMPLETE GAS |
| REVIEW THE FOLLOWING ITEMS ARE REQUIRED. SUBMIT AN |
| ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL CUT SECTIONS |
| OF PIPE AND CORRESPONDING LENGTHS PER FBC-2014 FUEL |
| GAS, SECS. 402.4.1, 402.4.2. |
| |
| SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL PIPE |
| SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS STEEL |
| TUBING FOR EACH PIPE SIZE IF BEING USED. WPB AMENDMENTS |
| TO FBC SEC. 107.2.1. |
| |
| TYPE OF GAS, (LP OR NATURAL). |
| |
| BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| THE SYSTEM. REFER TO THE FBC-2014 FUEL GAS SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(37). |
| |
| SHOW THE DISTANCE FROM THE POINT OF DELIVERY, (METER), |
| TO THE MOST REMOTE OUTLET IN THE BUILDING AND/OR SYSTEM |
| PER THE FBC-2014 FUEL GAS APPENDIX A ? USE OF CAPACITY |
| SECTION A.3.1(4) & 2014 FUEL GAS CODE SEC. 402.4.1. |
| |
| SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE FBC-2014 |
| FUEL GAS CODE SEC. 304. |
| |
| INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014 FUEL |
| GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE |
| SEC. 502 THRU 505. |
| |
| SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL GAS |
| EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS |
| |