2016-04-05 17:47:42 | ELECTRICAL REVIEW COMMENTS |
| REVIEWED FOR COMPLIANCE WITH: |
| 5TH EDITION OF THE FBC 2014 & NFPA 70 (NEC) 2011 |
| EDITION |
| |
| CORRECTIONS REQUIRED: |
| 1. THE RISER DIAGRAM SHOWS THE SERVICE AS 277/480 3 |
| PHASE GOING INTO A STEP DOWN TRANSFORMER TO 120/208 BUT |
| THE SERVICE REQUIREMENT AS PER THE PANEL SCHEDULE IS |
| 120/240 3 PHASE GOING INTO A 3 PHASE DISC. OF WHICH TWO |
| PHASES ARE BEING USED. |
| 2. THE PANEL SCHEDULE ON THE PRIMARY PERMIT HAS A |
| DEMAND LOAD OF 54.8 AMP AND THE PANEL SCHEDULE ON THE |
| NEW PLANS HAVE A CONNECTED DEMAND LOAD OF 73.6 AMP. |
| SUBMIT SPECS |
| 3. THE RISER DOES NOT INDICATE THE CONDUCTOR INSULATION |
| RATING THEREFORE ASSUMING IT IS 60 DEGREE, THE MAXIMUM |
| DISTANCE BETWEEN THE MAIN DISC AND THE TRAILERS DISC IS |
| ONLY 136'. |
| 4. PHYSICAL PROTECTION AS REQUIRED IN NEC 110.27(B) |
| SHALL BE PROVIDED AND INDICATED ON PLANS. |
| |
| WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR |
| RE-SUBMITTAL, PLEASE PROVIDE A RESPONSE LETTER |
| (NARRATIVE) ADDRESSING EACH ITEM AND THE PAGE NUMBER |
| WHERE THE CORRECTIONS APPEAR ALONG WITH THE STANDARD |
| CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE INSERT |
| CORRECTED PAGES INTO THE SUBMITTAL PACKAGE. MARK VOID |
| AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR |
| COMPARATIVE REVIEW. CLOUDING THE CHANGES WILL BE |
| GREATLY APPRECIATED. |
| |
| IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO |
| CONTACT ME DIRECTLY. |
| |
| THANK YOU, |
| MIKE ALBARRAN |
| ELECTRICAL PLANS EXAMINER |
| PH: 561-805-6746 |
| EMAIL: [email protected] |
| |