Date |
Text |
2015-10-05 15:58:45 | 1ST REVIEW: FBC 2014 |
| |
| GEORGE JOHNSON |
| PLUMBING PLANS EXAMINER |
| CITY OF WEST PALM BEACH |
| 561-805-6711 |
| [email protected] |
| |
| |
| GAS COMMENTS: |
| |
| |
| 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL |
| CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER |
| FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2. |
| |
| 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL |
| PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS |
| STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. WPB |
| AMENDMENTS TO FBC SEC. 107.2.1. |
| |
| 3. TYPE OF GAS, (LP OR NATURAL). |
| |
| 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON |
| THE SYSTEM. REFER TO THE FBC-2014 FUEL GAS SECS. 401.8 |
| THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(37). |
| |
| 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY, |
| (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING |
| AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ? |
| USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE |
| SEC. 402.4.1. |
| |
| 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE |
| FBC-2014 FUEL GAS CODE SEC. 304. |
| |
| 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014 |
| FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2 |
| PSI. |
| |
| 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND |
| TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE |
| SEC. 502 THRU 505. |
| |
| 9. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL |
| GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA |
| 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2 |
| |
| |